My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/20/1988
CBCC
>
Meetings
>
1980's
>
1988
>
9/20/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:11 PM
Creation date
6/12/2015 2:26:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/20/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOILS WORK FOR NORTH COUNTY WASTEWATER SYSTEM <br />The Board reviewed memo from William McCain, Utility <br />Engineer: <br />TO; WILLIAM G. COLLINS, II DATE: AUGUST 30, 1988 <br />ACTING. COUNTY ADMINISTRATOR <br />THRU: TERRANCE G. PINT / <br />DIRECTOR OF UTILI ERVICES <br />FROM: WILLIAM F. McCAI <br />PROJECTS ENGINES <br />DEPARTMENT OF UTIL Y SERVICES <br />SUBJECT: SOILS WORK FOR THE NORTH COUNTY WASTEWATER COLLECTION AND <br />TRANSMISSION SYSTEM <br />BACKGROUND <br />Masteller and Moler Associates, Inc., has designed the North County <br />sewer project. The preliminary plans for the collection system are <br />currently under review by this Department. Before the project is <br />finalized and put out for bid soils exploration eed to be done <br />throughout -the project. <br />ANALYSIS <br />The Consultants on this project have received estimates from several <br />soils testing firms, the lowest of which was from Universal <br />Engineering Testing Company of Merritt Island, FL., in the amount <br />of $3,495.00. <br />It is important to have the soils work completed prior to bidding to <br />assure more precise bidding. Without soils investigation, <br />Contractors tend to bid worse case conditions. <br />RECOMMENDATION <br />The Department of Utility Services recommends tha the Board of <br />County Commissioners approve the above action, a d by doing so <br />approve the forthcoming contracts with Universal En ineering. <br />ON MOTION by Commissioner Eggert, SECONDED by Commis- <br />sioner Bowman,. the Board unanimously approv�d the soils <br />work for the North County sewer project berg done by <br />Universal Engineering Testing Company of Mekritt Island <br />in the amount of $3,495 as recommended by siaff and <br />authorized Masteller S Moler to contract with them. <br />fi 20 �J�`7 65 <br />toor 74 Facr 349 <br />
The URL can be used to link to this page
Your browser does not support the video tag.