Laserfiche WebLink
Development Costs <br />Phase II - Demolition, Site Improvements <br />1.1 Site utility improvements $ 65,000 <br />1.2 Demolition of existing courthouse and <br />Annex buildings 148,000 <br />1.3 Landscape Improvements 112,500 <br />1.4 Walkways, paved area for vehicle parking 108,000 <br />1.5 Subtotal 433,500 <br />1.6 Contingency (@ 5% of subtotal) 22,000 <br />1.7 Estimated Development Costs $ 455,500 <br />Summary - Option C <br />1. .Phase IA $ 139,740 <br />2. Phase I 11,157,048 <br />3. Phase II 455,500 <br />4. Total Estimated Development Costs $ 11,752,288 <br />Mr.Reeves pointed out that Option C calls for 75,000 square <br />feet along with the construction of some 28,500 feet of shell <br />space which can be filled in as space needs increase. <br />Commissioner Eggert asked the projected cost of the shell <br />space, and Mr. Reeves advised that the cost for completed <br />construction is $96 per sq. ft., and the shell space is $60 per <br />sq. ft. The shell space cost includes the sizing of the <br />mechanical equipment, air conditioning, elevators, electrical <br />vaults and all the elements so that nothing will have to be torn <br />down when those items are ready to be installed. <br />Chairman Scurlock felt we would be well served by going with <br />Option C, which excludes the building of a 5th courtroom in the <br />Pocahontas Building. He believed the community would like to see <br />the historical elements saved if we can come up with a cost <br />effective approach. <br />Commissioner Eggert asked if the present Courthouse could be <br />used if it were gutted and restored, and Mr. Reeves explained that <br />while it has adaptive reuse possibilities, it really is not <br />appropriate any longer for a courts facility. It could be <br />remodeled for use by the Attorney's Office or the Public <br />Defender's Office. The way the courts are laid out today, with <br />separate paths of circulation, the existing building could not be <br />20 <br />NOV 81988 <br />BOOK 75 <br />uGE 11 <br />