Laserfiche WebLink
THE SPACE NEEDS ANALYSIS FOR THE COURTHOUSE FACILITY IS ON FILE IN <br />ITS ENTIRETY IN THE OFFICE OF THE CLERK TO THE BOARD <br />NORTH COUNTY OFFICE SPACE <br />The Board reviewed the following memo dated 11/1/88: <br />TO: Board of County Commissioners DATE: November 2, 1988 FILE: <br />SUBJECT: NORTH COUNTY OFFICE <br />SPACE <br />William G. Collins II <br />FROM:Acting County Administrator REFERENCES: <br />The Board deferred any action on David Fisher's North County Office Leasing <br />Proposal on October 11th until such time as the staffing, equipment and <br />operational costs were determined. <br />Please find attached those costs as prepared by our Budget Office in <br />consultation with the departments requesting space. <br />Since the time of that meeting I have been contacted by other leasing agents <br />from the Sebastian area. One offering was for spac <br />sq. ft. for terms of one year or more at a rate of <br />there may be locational consideration involved in ch <br />sites, this more recent offering on U.S.#1 between Rt. <br />offer more flexibility in s of space requirements a <br />does so at a cost that is lower per sq. ft. than Mr. <br />Recommendation <br />61„ <br />County space requirements are currently quite low an <br />committing to a smaller space than Mr. Fisher has <br />recommend declining Mr. Fisher's proposal and pursuing <br />needed' basis until such time as County space requir <br />time we should investigate building our own North Coun <br />crements of 1,040 <br />per sq. ft. While <br />ng between different <br />512 and Rt. 510 does <br />d leasing terms, and <br />Fisher's proposal. <br />could be satisfied by <br />proposed. I would <br />small leases on an 'as <br />ents grow. At that <br />y Complex. <br />Administrator Collins pointed out two corrections to figures <br />in the above memo. The $7.50 per sq. ft. rate is actually $8.25, <br />which changes the 25% figure to 17.5%. <br />OMB Director Joe Baird pointed out that the bottom line in <br />the following operating cost list is $386,145, instead of <br />$366,145. <br />NOV 8 BM <br />24 <br />BOOK <br />F',�GE 1 22 <br />