My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/1988
CBCC
>
Meetings
>
1980's
>
1988
>
11/17/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:25:21 AM
Creation date
6/12/2015 2:34:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
11/17/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Manager Little wished to know if there is anything <br />going on with the East Causeway/A-1-A intersection. <br />Mr. Suthard advised there is nothing on the 5 -year plan. <br />The City is finishing some traffic studies on A -1-A and has found <br />that we have a lot higher traffic flow there than anticipated. <br />They will advise the DOT of their studies, and hopefully that <br />will encourage them to fast-track that project. <br />Discussion continued about better markings on the pavement <br />to improve the traffic flow at that intersection. <br />Commissioner Wheeler brought up resurfacing Route 60, and <br />was informed this will be included with the Twin Pairs project. <br />WASTEWATER <br />Vero Beach Treatment Plant Capacity <br />City Manager Little reported that the City has finally <br />gotten all the package treatment plants on the island within the <br />City limits out of service. They are rebuilding lift stations in <br />Indian River Shores and have already rebuilt the lift stations in <br />The Moorings and will do some line rejuvenation work there. They <br />do not anticipate sewer in some areas on the Beach as the <br />percolation is good there, and it is all single family. <br />City Manager Little requested that the county not make any <br />more plans after today, beyond those things they have legally <br />committed to in writing, for flow into the City wastewater <br />treatment plant until the City can complete a study to see where <br />they will be on build -out. What triggered this was an approach <br />from Mr. Pinto's staff wanting to have a larger line and some <br />other facilities as part of the reconstruction they are doing at <br />the plant now. Also, there are rumors about running the line <br />down U.S.I, and Mr. Little did not think the City can accommodate <br />that flow. He felt that when build -out occurs in the area east of <br />6th Avenue and down to Vista Royale that will be about as far as <br />they can go. <br />14 <br />N9V 171988 <br />BOOK <br />75 ,J:200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.