Laserfiche WebLink
**************************************************w**way********wit***w* <br />The amount of the Contract will be INCREASED by the sum of: <br />Forty-two thousand two hundred and 00/100 dollars (842,200.00). <br />(written amount) <br />The Contract total including this Change Order will be: <br />Three hundred forty-one thousand nine hundred twelve and 50/100 <br />(written amount) <br />Dollars ($ 341,912.50 ). <br />The Contract Time provided for Project Completion will be UNCHANGED <br />( ) Days. <br />This document will become a supplement to the Contract and all__ <br />provisions will apply hereto. <br />q,.`- G Eco. <br />*********************,R************************************************* <br />CONTRACTOR: <br />ENGINEER: <br />OWNER: <br />Masteller & Moler Associates, Inc. <br />DATE: ///00df <br />DATE: <br />11 1 SINS <br />DATE: A:12 - "8r <br />Indian River County til. Dept.; Terrance G. Pinto, Director <br />FARMERS HOME ADMINISTRATION:, <br />DATE: <br />WATER LINE EXTENSION - U.S.#1 FROM 10TH ST. TO SOUTH RELIEF CANAL <br />The Board reviewed memo from the Utility staff: <br />DATE: NOVEMBER 23, 1988 <br />TO: <br />THRU: TERRANCE G. PINT , e <br />DIRECTOR OF UTILI SEI ACES <br />WILLIAM G. COLLINS, II <br />ACTING COUNTY ADMINISTRATOR <br />FROM: <br />WILLIAM F. MCCAIN <br />PROJECTS ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: INDIAN RIVER COUNTY WATER LINE EXTENSION ON U.S. #1 <br />FROM 10TH STREET TO THE SOUTH RELIEF CANAL - <br />PROJECT NUMBER UW-8705DS. <br />BACKGROUND <br />The Department of Utility Services has plans and construction <br />documents finalized for the above referenced project. We have also <br />put the preliminary assessment roll in place. The Florida <br />Department of Transportation (FOOT) is also ready to do a road and <br />drainage improvement project along the same route as our water line <br />extension. Due to the redundancy of restoration work involved with <br />79 <br />DEC 6 1988 <br />(;OOK 75 FACE 329 <br />