My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/1988
CBCC
>
Meetings
>
1980's
>
1988
>
12/20/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:28:47 AM
Creation date
6/12/2015 2:38:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/20/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
View images
View plain text
DEC 2 01988 <br />t+• <br />,• <br />CHANG13 ORDER <br />AJO. 1 <br />DATED/7",A <br />BOOK 75 rAGE 425 <br />OWNER'S PROJECT NO. R557 ENGINEER'S PROJECT NO. <br />PROJECT [;n1As.n Gann, Park <br />OWNER TnAian River ['minty <br />CONTRACTOR Rarth Cnnatrnr-tinn Tnc CONTRACT DATE Lily 79, 19RR <br />CONTRACT FOR Division I (structure & grounds). Division III (landscaping) <br />and Division IV(irrigation) <br />NATURE OF THE CHANGE: <br />1. Increase size of drainfields from 500sf to 700 sf each <br />(required by septic tank permit) <br />2. Extend water service to SRA1A right-of-way from well <br />location 3501f, 2" PVC @$3.10 1,085.00 <br />$ 924.00 <br />3. Extend front wall of restroom building to roof and add <br />louvers & enclosure <br />4. Soil treatment for termites under all structures (required) <br />by Building Dept.) <br />5. Clear path for power lines <br />6. Furnish and install sand fill at restroom building <br />7. Furnish and install sand fill around play structures <br />8. Revised landscaping schedule <br />2,053.26 <br />253.00 <br />55.00 <br />565.63 <br />890.00 <br />(164.25)' <br />Total increase $5,661.64 <br />The changes result in the following adjustment of Contract price and Time: <br />Original Contract Price $ 218.122.30 <br />Contract Adjustment by previous Change Orders $ -0- <br />Net (Increase) (INcrpluppiresultingfrms this Change Order ..$ <br />5,661:64 <br />Current Price Including This Change Order $ 721,781 94 <br />Contract Time Prior to this Change Order 1R0 Calendar Days <br />Net (Increase) (Decrease) resulting from <br />this Change Order -0- Calendar Days <br />Current Contract time including this <br />Change Order 15n Calendar Days <br />CONTRACT COMPLETION DATE IS - Remains at Jan. 27. 1989 <br />recommended <br />The above changes are pppriy91:/ <br />By: <br />. Engineer <br />• <br />Date: <br />The above changes are accepted: <br />Iiidlan Rive Ca <br />Approved <br />Date <br />Admin. <br />1 )& C— <br />1W2111 <br />M <br />Budget <br />ramilvm <br />, Dept. ' <br />Risk,Mgr. <br />/A <br />IMINIII <br />Barth Construction, Inc. <br />Contractor <br />By: <br />Title: <br />Date: <br />gfalPfiv <br />/2- f -tfh <br />ACCEPTED BY: <br />INDIAN RIVER COUNTY, FLORIDA <br />/97-Yf <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).