My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1989
CBCC
>
Meetings
>
1980's
>
1989
>
1/24/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:19:18 AM
Creation date
6/12/2015 2:42:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/24/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No. <br />CHANGE ORDER <br />3 <br />Dated December 22, 1988 <br />Owner's Project No. 88-40 Engineer's Project No. 88-167 <br />Project Kings Highway Bridge Phase I <br />Owner Indian River County <br />Contractor Murphy Construction Co.Contract Date August 1, 1988 <br />Contract Per Kings Highway Bridge Replacement at North Relief Canal <br />Nature of the Change: <br />Increases and decreases in contract quantity <br />of various contract items. Lump sum additions <br />to contract for grading at end bents. <br />Item <br />NO: <br />Descritption <br />Plan Revised Unit Change in <br />Qty. Qty. Price Contract Amt. <br />12. Prestressed Concrete 1950 L.F. 1795 L.F. 13.00 -2,015.00 <br />Piling Furnished, 14" sq <br />13. Prestressed Concrte 1950 L.F. 1536 L.F. 8.50 -3,519.00 <br />Piling Driven, 14" sq. <br />16. Guardrail 125 L.F. 100 L.F. 19.50 - 487.50 <br />23. Sodding (Bahia) 600 S.Y. 978 S.Y. 2.40 + 907.20 <br />25. Typs S Asphalt Concrete 80 TONS 133 TONS 85.00 +4,505.00 <br />28. Const. Signs. (Post MTD.) 1620 E.D. 220 E.D. 1.16 -1,624.00 <br />29. High Intensity Flashing 900 E.D. 0 E.D. 2.64 -2,376.00 <br />Lights. (temp. Type B) <br />30. Barricade (Temp. Type III) 6' 360 E.D. 60 E.D. 2.90 - 870.00 <br />33. Grading at End Bents 1 L.S. 1,500.00 +1,500.00 <br />• <br />TOTAL GROSS INCREASE: -3,979.30 <br />The changes result in the following adjustment of Contract Price and Time: <br />Contract Price Prior to this Change Order $ 277,823.44 <br />Net (Increase) (Decrease) resulting from this Change Order 1,3.$7930 <br />Current Price Including This Change Order . $ 273,844.14 <br />Contract Time Prior to. this Change Order <br />Net (Increase) 4Beeeeeee} resulting from this <br />Change Order <br />Current Contract time including this Change <br />Order <br />75 <br />1 <br />76 <br />Calendar. Days. <br />Calendar Days <br />Calendar Days <br />The above changes are approved: <br />The above changes are accepted: <br />m:n len Co <br />Amerce <br />Dale <br />Admin. <br />Legal <br />W GC <br />i-I7- <br />9ideel <br />DeeL fu) <br />11:5. fi <br />Nish Mar. <br />fp <br />AN 24 1989 <br />L <br />60 <br />ACCEPTED 8Y: <br />Date: - •:e2/1- D7 <br />NO. ME 708 <br />
The URL can be used to link to this page
Your browser does not support the video tag.