My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/7/1989
CBCC
>
Meetings
>
1980's
>
1989
>
2/7/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:43:05 AM
Creation date
6/12/2015 2:38:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/07/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prr- <br />FEB 7 1989 <br />BOOK 76 FADE 52 <br />Scope <br />This task will involve collection of existing reports, plans, and other data <br />necessary to determine the present status of effluent disposal in Indian River <br />County. The data collected and reviewed will include: <br />o Previous reports analyzing effluent disposal for various treatment <br />facilities in Indian River County. <br />o Permit applications, engineering reports, issued permits and con- <br />struction plans for current and proposed effluent disposal projects. <br />o Review of projects in progress. <br />In addition to the data listed above, reports and studies previously collected <br />by PBS&J will be reviewed including the Wastewater Master Plan. A meeting will <br />be held at completion of this task to review the findings with the County. <br />Input <br />The County will provide the reports and other data needed to conduct this task. <br />PBS&J will identify areas of additional information needed and items which may <br />be missing from information already supplied. The preliminary report shall <br />identify items used for the basis of the report. <br />Output <br />The data collected and reviewed will be used as the basis of the Preliminary <br />Assessment report described in later tasks and as groundwork for developing the <br />Effluent Disposal Master Plan scope of services. <br />TASK 2 DRAFT PRELIMINARY ASSESSMENT REPORT <br />Objective <br />To prepare a draft Preliminary Assessment Report. <br />Scope <br />A draft Preliminary Assessment Report will be prepared which will summarize the <br />findings in Task 1. As part of this report, a draft Phase II scope of services, <br />including a schedule and budget, will be developed for the Effluent Disposal <br />Master Plan. <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.