Laserfiche WebLink
FEa 21 )989 <br />BOOK 76 FAGE 178 <br />CHANGE ORDER #2 - GOLDEN SANDS PARK (DICKERSON) <br />The Board reviewed memo from County Engineer James White: <br />TO: James Chandler <br />County Administrator <br />FROM: James D. White, P.E. <br />Acting County Enginee <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />SUBJECT: Change Order #2 -.Golden Sands Park <br />Modification to SA A1A, Dickerson Florida, Inc. <br />DATE: February 10, 1989 <br />Description and Conditions <br />The approved drawings for the paving work on SR A1A described the <br />5/8 inch thick friction course to end in the middle of the paved <br />shoulder, or approximately 2 feet from the edge of the pavement. <br />This would leave a 5/8 inch ridge in the road surface. DOT said <br />that was an oversight in the review or the plans would not have <br />been approved. The contractor will extend the friction course 2' <br />on each side at the same unit ratio as the rest of the surface <br />for a total cost invoice of $777.60. <br />Alternates and Analysis <br />The alternative to approving the change is to accept the ridge in <br />the pavement which could pose a safety hazard to motorists and <br />bike riders. <br />Recommendations and Funding <br />Staff recommends that the chairman be authorized to execute this <br />change order #2 for a cost invoice of $777.60. Funds are <br />available in Fund 310. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Bowman, the Board unanimously authorized <br />the Chairman to execute Change Order #2 for altera- <br />tions to SR A1A at the entrance to Golden Sands Park <br />in the amount of $777.60. <br />18 <br />