My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/21/1989
CBCC
>
Meetings
>
1980's
>
1989
>
3/21/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:44:02 AM
Creation date
6/12/2015 2:44:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/21/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Petition Paving project. This is a funding source that was <br />recommended by the dvisory Committee of the Vero Lake Estates <br />Property Owners Association. <br />In discussion, it was noted that Association does not <br />represent everyone in the area, but Director Davis advised that <br />there were about 40 people at the last meeting he attended. <br />Commissioner =ird wished to know if the taxes that come into <br />that MSTU are mainly for drainage. <br />Director Davis stated that basically to date they have been <br />working on a drainage study. They have not spent $100,000. The <br />first draft of the <br />communicating with <br />of the other entiti <br />The drainage work t <br />associated with thil. <br />drainage as we do a <br />Commissioner B <br />is one of the main <br />study is now complete and they are <br />the Sebastian River Drainage District and some <br />es that have control over the watershed area. <br />hey have done out there primarily has been <br />s paving project; we are incorporating the <br />n improvement. <br />ird asked if the Advisory Committee feels this <br />thoroughfares out there and that paving it <br />will give people better access to more homesites. <br />Discussion ens <br />section is one of t <br />long; and it is bei <br />assessments, as wel <br />ued, and Director Davis confirmed that this <br />he main thoroughfares; it is about 11 miles <br />ng paid for by the MSTU plus the front footage <br />1 as about $10,000 from impact fees. <br />Commissioner Bowman commented that the MSTU previously <br />assessed themselves $15 per parcel/acre for road and drainage <br />improvements, and Mr. McBride stated that he was under the <br />impression it was for drainage only. He was informed that was <br />not the case. <br />In further discussion, it was noted that the original pro- <br />posal was aimed at paving roads, and then it was decided that <br />drainage for the whole area was a significant problem also. <br />Commissioner Bird pointed out that, if Mr. McBride's objec- <br />tion is to paving the road, as more and more people move out <br />there, it is very probably only a matter of time until most of <br />23 <br />MAR 21 1989 euUK ib Fair 41b <br />
The URL can be used to link to this page
Your browser does not support the video tag.