My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/1989
CBCC
>
Meetings
>
1980's
>
1989
>
4/4/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:51:01 AM
Creation date
6/12/2015 2:45:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/04/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
also. He believed that the County would be wise to sit down with <br />Chief Gabbard and City Manager Little and see what the problem <br />is. He believed the City and County could work together and <br />solve the problem for a lot Tess than $70,000. Mr. McCall felt <br />there are many alternatives that can be looked into. He stressed <br />that he is 100% for the Sheriff's Department having a range, <br />which he felt is very much needed and long overdue. <br />COMMISSIONER SCURLOCK AGREED TO SECOND the Motion to <br />table for a week. <br />THE CHAIRMAN CALLED FOR THE QUESTION. It was voted <br />on and carried unanimously. <br />HERON CAY FORCE MAIN <br />The Board reviewed memo from Environmental Specialist John <br />Lang: <br />DATE: <br />TO: <br />FROM: <br />MARCH 23, 1989 <br />JAMES E. CHANDLER <br />C()COUNTY ADMINISTRAT <br />TERRANCE G. PINT <br />DEPARTMENT OF U TY <br />PREPARED AND <br />STAFFED BY: JOHN FREDERICK LANG <br />ENVIRONMENTAL SPECIAL <br />SUBJECT: HERON CAY FORCE MAIN <br />SERVICES <br />BACKGROUND: <br />The Department of Utility Services decommissioned the Heron Cay <br />Wastewater Treatment Plant several years ago and filled in the <br />percolation ponds. The demolition of the Wastewater Treatment Plant <br />has been satisfactorily completed. The Department is in receipt of <br />the development plans for this site and it is now necessary to lower <br />and reposition a short segment of the 4" and 8" force mains which <br />are currently exposed due to land elevation changes. The Department <br />of Public Works is assisting by providing a survey of the site <br />where the force main will be placed. The owner/developer has agreed <br />to grant a 15' easement to the County for the force main location <br />and the lift station location. The two contractors on the site have <br />submitted proposals to the County for the work necessary. <br />ANALYSIS: <br />Belvedere Construction has submitted a quote of $5,650.00 and A & R <br />Construction has submitted a price of $5,700.00 for the relocation <br />work. Both firms have not submitted mobilization costs because they <br />are on-site generating lower quotes. <br />APR 41999 27 <br />BOOK <br />FvE 5i1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.