My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/06/1989
CBCC
>
Meetings
>
1980's
>
1989
>
06/06/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:15:12 AM
Creation date
6/12/2015 2:52:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/06/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 6 1989 <br />BOOK 76 F':�E161 <br />CHANGE ORDER NO. 1 - PHASE II - KINGS HIGHWAY WATERLINE <br />The Board reviewed the following memo dated 5/15/89: <br />DATE: <br />TO: <br />FROM: <br />PREPARED & <br />MAY 15, 1989 <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />TERRANCE G. PINTO <br />DIRECTOR OF UTILITY S RVICES <br />STAFFED BY: WILLIAM F. McCAIN <br />PROJECT ENGINEER\ <br />DEPARTMENT OF umizt SERVICES <br />SUBJECT: CHANGE ORDER NO. 1 FOR KINGS HIGHWAY PHASE II <br />IRC PROJECT NO: UW -87 -23 -DS <br />BACKGROUND: <br />The Kings Highway 20" waterline from Lindsey Road to South Winter <br />Beach Road is nearing completion. To this end, we now have some <br />adjustments to make to the scope of work for Contract II, Kings <br />Highway. Three items are involved in this change order, the first <br />is a cost reduction due to the elimination of an aerial canal <br />crossing; the second and third involve the connection of the Bent <br />Pine community to our water system. <br />ANALYSIS: <br />The line item changes to be made to the contract are as follows: <br />1. The modification of the North <br />Relief Canal crossing. <br />2. Approximately 1,900+/- feet <br />of 8" PVC to connect Bent Pine. <br />3. Restoration for water main <br />construction along <br />Bent Pine Drive. <br />-($19,750.00) <br />+$24,130.00 <br />+$2,500.00 <br />These changes make a net change in the project cost of $6,880.00, <br />which is a reasonable cost increase considering the magnitude of the <br />work. This changes the total construction cost from $507,135.00 to <br />$514,015.00. The funds for this project will come from Account No. <br />472-000-169-063-00'. <br />RECOMMENDATION: <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve and execute the attached <br />Change Order No. 1 to Contract II of the Kings Highway Potable Water <br />Main. <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.