My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/13/1989
CBCC
>
Meetings
>
1980's
>
1989
>
6/13/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:02 PM
Creation date
6/15/2015 4:36:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/13/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. ANALYSIS: <br />-::-Staff has reviewed the suhnittal to ascertain adherence to <br />specifications. Traffic Products was the low responsible <br />bidder to met all requirements. <br />reitlents. <br />' 3 . UNDING: <br />Monies for this project will carie from Account #109-214-541-066.51 <br />Total. Budget Funds is $3,816.80. <br />4. ON: <br />Staff reccmTends the Award of a Fixed Contract for $3,816.80 <br />to the low responsible bidder, Traffic Products for the subject <br />cxamlodity. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Eggert, the Board unanimously awarded <br />Bid 89-65 for Traffic Signal Equipment to the low <br />responsible bidder, TRAFFIC PRODUCTS, per the <br />following Bid Tabulation: <br />BOARD OF COUNTY COMMISSIONERS <br />1840 25th Street. Vero Beach. Florida 32960 <br />��vERc <br />Q' <br />T.Irohon.: 13051 887•8000 <br /># * <br />Recommended Award Traffic Products RI $3,816.80 $3=816.80 <br />Gate= 5-31-89 <br />PURCHASING DEPT. <br />BID TABULATION <br />Submitted By Dominick L Mascola <br />PURCHASING MANAGER <br />Bid WIRC8945 Date Of Opening May 31, 1989 <br />I <br />Bid Title Traffic Signal Equipment <br />1. <br />Traffic PartsI <br />$ 396.00 (Item X12 only) <br />, <br />e <br />2. <br />Engineered Casting <br />2,247.04 (Minus Item 12) <br />3. <br />Cost Casting <br />2,416.60 (Minus Item 12) <br />i <br />i <br />1 <br />4. <br />Traffic Products <br />3,816.80 <br />5. <br />Signal Construction <br />4,014.08 <br />I <br />-I <br />6. <br />Joe's Barricades <br />N/B <br />1 <br />a <br />JUN I S 1989 11 BooK 77 I,lu 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.