Laserfiche WebLink
Commissioner Bird asked if the Board has to approve things <br />such as this', and Administrator Chandler noted that is one of <br />those situations where there is no policy and no over all <br />criteria. <br />Commissioner Bird commented that he would like to adopt a <br />policy whereby the Administrator could handle things of this <br />nature. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />ENGINEERING SER ICES FOR TREASURE SHORES PARK <br />The Board �eviewed memo from County Engineer James White: <br />---------------0--------------------------------------------------- <br />TO: James',Chandler <br />County Administrator <br />THROUGH: James!W. Davis, P.E. <br />Public Works Directo <br />FROM: JamesiD. White, P.E. n <br />County Engineer K/ <br />SUBJECT: Engineering Services for Treasure Shores Park <br />DATE: June �5, 1989 <br />--------------- -------------------------------------------------- <br />DESCRIPTION ANDICONDITIONS <br />Staff is complekting final revisions of the Land Management Plan <br />for Treasure Shores Park. One of the requirements of land <br />acquired in co'peration with DNR and Save Our Shores Program is <br />to develop the first phase within 5 years. The proposed first <br />step to achieving this is to conduct needs and space planning, <br />conceptual design and cost estimates and submit grant <br />applications to!sources of available funding. <br />ALTERNATIVES AND ANALYSIS <br />The following alternates have been identified: <br />1. Begin engi Bering design of park improvements. This action <br />would include substantial expense. There is no source of <br />funds identified which could be used for this purpose. <br />H <br />2. Conduct needs analysis and plans, prepare preliminary cost <br />estimates and seek funding prior to starting detailed <br />design. This would involve less expense; to initially move <br />the project forward. Ai proposed request for qualifications <br />is attached which would begin the consultant selection <br />process. <br />1 0 9 r,. <br />JUN 2? 19'89 R[�OK � �' �a�;c P4 7 <br />