Laserfiche WebLink
result, buildings for which building permits were granted prior to <br />FDER certification and after sewer line construction began do not <br />have a sewer lateral to connect up to in two sewered areas. These <br />buildings, for which building permits were granted (on vacant lots), <br />have paid all fees for connection to the system, and the Department <br />must provide the lateral. <br />.ANALYSIS: <br />The South Sixth Avenue Sewer Improvement Project has been previously <br />bid and awarded to Ted Myers Contracting. This project has unit <br />pricing for this work. Therefore, the cost of bidding will be saved <br />and quantity discounts are available because of the larger size of <br />.-the project. The Department, because of these reasons, desires to <br />.utilize this contractor for the missing sewer laterals in the <br />Gifford area for existing granted building permits. Future new <br />building permits still require the owner to arrange for construction <br />of the lateral. <br />RECOMMENDATION: <br />The Department of Utility Services recommends that the Board of <br />County Commissioners authorize a change order to the contract to <br />allow for sewer laterals to be installed in the Gifford Project, on <br />an as -needed basis, for an period of time not to exceed 18 months. <br />The funding for this project would be from the Contingency Fund for <br />the Gifford Sewer Project. The costs shall not exceed $15,000.00. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Scurlock, the Board unanimously <br />approved staff's recommendation as set out in <br />the above memo. <br />SAID WORK ORDER WILL BE PLACED ON FILE IN THE OFFICE OF THE CLERK <br />TO THE BOARD WHEN FULLY EXECUTED AND RECEIVED <br />I <br />FINAL PAY REQUEST AND FINAL CHANGE ORDER - KINGS HIGHWAY AND <br />LINDSEY ROAD CONTRACT #2 <br />The Board reviewed the following memo dated 7/18/89: <br />77 <br />AUGPUR 1989 41 <br />