My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/8/1989 (3)
CBCC
>
Meetings
>
1980's
>
1989
>
8/8/1989 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:03 PM
Creation date
6/15/2015 4:50:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
08/08/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
present range would not be suitable for automatic weapons and <br />continued to emphasize the liability potential. <br />City Manager Little stated that the City will try to <br />expedite opening their range as much as possible, and Commis- <br />sioner Bird felt it will be at least a year before having the <br />range the County is proposing. <br />Mayor Macht believed it has been determined there is nothing <br />that would be mutually exclusive of either project and that both <br />should move ahead. This was generally agreed upon. <br />Downtown Redevelopment Area <br />Administrator Chandler gave an overview of the County's two <br />major projects, noting the Library and Courthouse are both on <br />schedule. On the main Library we are nearing final design and <br />anticipate coming back to the Commission in about 30-60 days with <br />construction to begin in November and completion of the building <br />within 1 year. In regard to the Courthouse, we have completed <br />the consultant selection process and are now in the process of <br />negotiating with Herbert Halback, Inc. We are looking at having <br />a master plan completed in the fall and then retaining an <br />architect for final design next spring with construction in 1991 <br />and final completion in 1993. We are asking the consultant to <br />work closely with the City on any plans re downtown parking, <br />traffic circulation, etc. Administrator Chandler stated that we <br />have had good dialogue back and forth with Planning Director <br />Walter Young and City Manager Little, and our consultant will be <br />coordinating with the City. Parking is a critical element, and <br />we are asking them to bring back several alternatives. <br />Mayor Macht inquired if there is any relationship between <br />the Courthouse Complex and a future building for the County <br />administration. <br />Administrator Chandler stated that there was none that he <br />knew of. He will, however, be looking at some of the County's <br />5 ��o� l r F°,r 590 <br />AUG 001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.