Laserfiche WebLink
present range would not be suitable for automatic weapons and <br />continued to emphasize the liability potential. <br />City Manager Little stated that the City will try to <br />expedite opening their range as much as possible, and Commis- <br />sioner Bird felt it will be at least a year before having the <br />range the County is proposing. <br />Mayor Macht believed it has been determined there is nothing <br />that would be mutually exclusive of either project and that both <br />should move ahead. This was generally agreed upon. <br />Downtown Redevelopment Area <br />Administrator Chandler gave an overview of the County's two <br />major projects, noting the Library and Courthouse are both on <br />schedule. On the main Library we are nearing final design and <br />anticipate coming back to the Commission in about 30-60 days with <br />construction to begin in November and completion of the building <br />within 1 year. In regard to the Courthouse, we have completed <br />the consultant selection process and are now in the process of <br />negotiating with Herbert Halback, Inc. We are looking at having <br />a master plan completed in the fall and then retaining an <br />architect for final design next spring with construction in 1991 <br />and final completion in 1993. We are asking the consultant to <br />work closely with the City on any plans re downtown parking, <br />traffic circulation, etc. Administrator Chandler stated that we <br />have had good dialogue back and forth with Planning Director <br />Walter Young and City Manager Little, and our consultant will be <br />coordinating with the City. Parking is a critical element, and <br />we are asking them to bring back several alternatives. <br />Mayor Macht inquired if there is any relationship between <br />the Courthouse Complex and a future building for the County <br />administration. <br />Administrator Chandler stated that there was none that he <br />knew of. He will, however, be looking at some of the County's <br />5 ��o� l r F°,r 590 <br />AUG 001 <br />