Laserfiche WebLink
_I <br />A U G� � I�'�Y � ` � PUGK 77 F' t 642 <br />.:4GINEERING WORK AUTHORIZAT .4 <br />DATE: June 19, 1989 _. WORK AUTHORIZATION NO. WW -2 FOR CONSULTING <br />SERVICES. PROJECT NO. 16 COUNTY, I.D. 86004L MASTELLER & MOLER <br />ASSOCIATES, INC. WASTEWATER. <br />I. PROJECT DESCRIPTION <br />Title: North County Subregional Sewer System <br />Wastewater Treatment Plant, Contract ill <br />Project #US87-25-SC <br />Consulting engineering services consisting of design, engineering, <br />preparation of contract plans and bid documents to prepare an <br />alternate design of the influent manually cleaned bar screen section <br />of the plant per Indian River County Utility Department's request. <br />Alternate plans will replace the manually cleaned bar screen with a <br />hydroscreen system. The contract documents will be revised and <br />amended to provide for a base bid with the manually cleaned bar <br />screen and alternate bid based on the hydroscreen system. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Master Agreement for Utilities Service" <br />dated October 4, 1988, and specific Article numbers and paragraph numbers <br />which are listed hereunder to describe the scope of services included on <br />this project. <br />A. Proiect Design Services per Master Agreement. <br />B. General Services During Construction per Master Agreement. <br />The Resident Inspector shall be a full-time employee of the <br />Engineering Consultant. The Resident Inspector's duties shall be to <br />monitor construction and be at the job site when project <br />construction is taking place, on a preacheduled periodic basis. <br />C. General Services During Construction per Master Agreement. <br />In addition, services shall include field surveys necessary, for <br />design and preparation of construction plans and, with assistance <br />from the County, obtaining various permits and approvals for <br />construction (permit fees to be paid by the County). <br />Also, in addition, the consultant shall, with the approval of this <br />authorization, submit a time phased job completion schedule. This <br />task oriented schedule, as negotiated, shall include these elements <br />of work:' <br />1. Releases from each public utility pertaining to underground <br />installations and/or interfering utility structures. <br />2. Submittal of all required permits and inspection schedules. <br />3. First and final submittal of construction drawings. <br />4. Submittal of construction contract bid packages (5), with <br />recommended construction completion time frame and a complete list <br />of all material required for project installation. <br />Note: Failure to meet these negotiated schedules will leave <br />consultant open for a negative performance evaluation, and/or <br />contract cancellation, or liquidated damages.*' <br />D. Consultant Engineer Insurance Requirement <br />1.1. Workers Compensation Insurance in accordance with Florida <br />Statutes. <br />2. Comprehensive and Automobile Liability with a minimum coverage <br />of 0100/300 per occurrence for bodily injury or accidental death. <br />3. Comprehensive General Liability with a minimum limit of <br />0 100/300 covering property damage. <br />4. Liability for Property Damage, while operating motor vehicle, <br />with minimum limits of 9 100/300 per occurrence. <br />5. Contractural Liability including limits established for Items <br />D, 2., 3., and 4. <br />6. Umbrella coverage, Excess Liability with minimum limits of <br />9.1,000,000.00 per occurrence. <br />46 <br />