Laserfiche WebLink
It is my recommendation that we award the job to Reliable Well Drilling. <br />There are three reasons why I recommend them over McLaughlin who is $500.00 <br />cheaper. <br />1) They "do not" require half of the amount as a retainer. <br />2) Completion time is within two weeks where as McLaughlin <br />cannot give me a firm date. <br />3) They are presently installing the wells for our rain shelters <br />and are doing a very good job. <br />I would like to proceed with this as soon as possible so it can be wrapped <br />up before the budget year ends. <br />If there are any questions please feel free to contact me. <br />i <br />Administrator Chandler emphasized that time is of the essence <br />on this project and this company has indicated that they will be <br />in next week and can have it completed in two weeks. <br />Commissioner Bowman was concerned about drilling this well, <br />even though the Board approved it back in August, and Commissioner <br />Bird explained that right now we are pumping out of a drainage <br />canal with a gasoline pump across #12 fairway into a large lake <br />and then picking it up at the other end of the lake with an <br />electric pump and pumping it back through a 6" line down to the <br />irrigation lake and then pumping it out of the irrigation lake <br />onto the golf course. <br />Commissioner Scurlock emphasized that this is just an interim <br />solution for 2-3 years unti-l-we can irrigate the course with <br />effluent. <br />Commissioner Bowman felt that every other alternative should <br />be explored before drilling this well because of the millions of <br />gallons of high -chloride water that will be draining down into the <br />shallow aquifer. <br />Commissioner Bird noted that Dodger Pines has been irrigating <br />that golf course out of artesian well water for years, and they <br />haven't had any problems. <br />25 <br />ROOK 7 f'r1�E �e <br />