Laserfiche WebLink
9 9 BOOK 78 F,Gr 51.E <br />been written up in enough detail and actually did not understand <br />what it was all about. <br />Director Pinto explained that one of the contracts under <br />FmHA was to go into the older section of Gifford where there were <br />existing sewers and go through a rehabilitation of that system. <br />Prior to this, we televised the lines and then came up with what <br />we need for rehabilitation. This is the final contract under the <br />Gifford project. This project was previously approved, and Mr. <br />Pinto believed reference should have been made in the memo to <br />that previous approval. <br />Commissioner Scurlock inquired about the estimate for this <br />project, and Director Pinto believed that it was only estimated <br />at something like $80,000 prior to televising the lines. <br />Commissioner Eggert wished to know if the loan had to be <br />adjusted, and Director Pinto advised that FmHA had no problem <br />with that. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Scurlock, the Board unanimously awarded <br />Bid #89-93 for Rehabilitation of Pineview Park and <br />High Ridge Mobile Home Park Gravity Sewer System to <br />JoBear, Inc., under a fixed contract for $141,089 <br />as recommended by staff and per the following Bid <br />Tabulation: <br />6 <br />