My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/2/1990
CBCC
>
Meetings
>
1990's
>
1990
>
1/2/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:43 PM
Creation date
6/16/2015 8:34:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/02/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D001� i t s I O U <br />H. Revisions to IRC Water and Wastewater Utility Standards <br />The Board reviewed the following memo dated 12/1/89: <br />DATE: DECEMBER 1, 1989 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />SUBJECT: REVISIONS TO INDIAN RIVER COUNTY <br />WATER AND WASTEWATER UTILITY STANDARDS <br />PREPARED AND STAFFED BY: SCOTT C. DOSCHER SC i <br />PRIVATE PROJECTS ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />BACKGROUND <br />The Indian River County Department of Utility Services Water and <br />Wastewater Utility Standards have been revised. Periodic revision <br />of standards is necessary to keep pace with industry standards, <br />County growth, and advances in engineering design. <br />ANALYSIS <br />The following significant changes were made to the specifications <br />1. The removal of a redundant gate valve on Detail W-7. <br />2. The removal of the bypass from the backflow preventer on <br />Detail W-9. <br />3. An outside drop has been added to the force main tie-in on <br />Detail S-12. <br />4. The notes for Detail M-3 have been rewritten. <br />5. Various details have been revised to reflect a minimum 36" <br />cover for all pipes. <br />6. Section 4, has been rewritten to allow polyethylene water <br />services. <br />7. Section 9, trailer mounted diesel generator, has been <br />eliminated. <br />8. Section 14, assessment procedures, has been eliminated and <br />replaced with submittal, permitting, and acceptance <br />procedures for private development projects. <br />Other changes were to correct typographical errors or wording in the <br />text. <br />RECOMMENDATION <br />The Department of Utility Services recommends that the Board of <br />County Commissioners approve the. adoption of the Utility Standards <br />on the consent agenda. <br />10 <br />r <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.