My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/11/1990
CBCC
>
Meetings
>
1990's
>
1990
>
1/11/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:43 PM
Creation date
6/16/2015 8:36:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
01/11/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN i i <br />199U <br />aoo� .7s <br />FticF 8 <br />Commissioner Wheeler pointed out that <br />it would cost <br />us <br />over <br />$1 -million to renovate the wings for any practical use. There is <br />a problem with dampness and the inefficiency of the high ceilings <br />and poor floor planning, not to mention the lack of proper <br />insulation for air-conditioning. <br />Mr. Halback advised that the basement area has water <br />penetration and the dampness is causing a deterioration of <br />records. <br />Mark Hargrove from Transportation Consulting Group of Winter <br />Park explained that most projects center around parking space <br />requirements, and in order to determine the number of spaces <br />required, they analyzed two scenarios. Based on those two <br />independent calculations, they determined that the parking <br />required for the new courthouse would be 442 spaces, which is <br />3.315 spaces per 1,000 square feet. <br />Mr. Hargrove next addressed the increase in trips generated <br />by the construction of a new courthouse, separating the net daily <br />trip generations from the net peak hour trip generations. Their <br />intersection analysis determined that the three signalized <br />intersections in the vicinity of the courthouse are operating at <br />an acceptable level of service, and also determined that the <br />majority of the 15 unsignalized intersections are operating at <br />acceptable levels of service. Notable delay was calculated for <br />'two minor street approaches along 20th Street. The total <br />approach volumes for these minor streets are minimal and, <br />therefore, are not significant enough to warrant monitoring for <br />signalization or the addition of any turning lanes. <br />Design Process <br />Keith Reeves of Architects Design Group, Inc. of Winter Park <br />explained that 11 concepts had been considered before arriving at <br />the final three concepts, and each concept was looked at with <br />respect to the parking requirements now and in the future. <br />5 <br />L::_1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.