My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/23/1990
CBCC
>
Meetings
>
1990's
>
1990
>
1/23/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:43 PM
Creation date
6/5/2015 12:50:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/23/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: James Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E., <br />Public Works Director �r <br />SUBJECT: Street Light at 1st Street SW and 43rd Avenue <br />REF. MEMO: 1) C.R. Eggert to Jim Davis dated Dec. 20, 1989 <br />2)- Letter dated Dec. 19, 1989 from James Davis to <br />Teresa Ryan <br />DATE: January 11, 1990 <br />DESCRIPTION AND CONDITIONS <br />The County staff has had numerous street light requests at <br />this intersection. Staff has visited the site and performed <br />a street light evaluation. Even though the location does <br />not meet our minimum. warrant criteria (score of 39.4 - <br />minimum warrant score is 56.25), the following special <br />exceptions apply: <br />1) The County has installed and currently pays for a <br />street light at all major intersections along 43rd <br />.Avenue between SR60 and 4th Street( such as 4th Street, <br />8th Street, 12th Street, etc.). <br />2) This area is reported to be a high crime area. <br />3) A fatality was reported to occur at the intersection in <br />November, 1989. An accident history __i_%__attached. <br />ALTERNATIVES AND ANALYSIS <br />The Alternatives are as follows <br />Alternative 1 <br />Based on a low evaluation score, deny the various <br />requests and not install a street light at the <br />intersection. <br />Alternative 2 <br />Due to the special conditions at the site; install a <br />street light at the intersection. The yearly cost to <br />the County is $150 per year. <br />RECOTIENDATIONS AND FUNDING <br />_-.---It is recommended that Alternative #2 be approved and that a <br />p`street light be installed. Funding to be from Fund <br />111-245-541-034.31 - Traffic Engineering. <br />MOTION WAS MADE by Commissioner Wheeler, SECONDED by Com- <br />missioner Bowman, to approve Alternative 2 and install a <br />street light at the intersection as recommended by staff. <br />Commissioner Scurlock asked if this is standard policy now, <br />and Public Works Director Davis advised that we usually evaluate <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.