My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/20/1990
CBCC
>
Meetings
>
1990's
>
1990
>
2/20/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:44 PM
Creation date
6/16/2015 8:48:53 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/20/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EPA "NO DISCHARGE" NATIONAL POLLUTANT DISCHARGE ELIMINATION <br />SYSTEM PERMITS <br />DATE: <br />The Board reviewed the following memo dated 2/7/90: <br />FEBRUARY 7, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINT <br />DIRECTOR OF UTIL ERVICES <br />SUBJECT: EPA "NO DISCHARGE" NATIONAL POLLUTANT <br />DISCHARGE ELIMINATION SYSTEM PERMITS <br />PREPARED AND STAFFED BY: JOHN F. LANGtL' <br />ENVIRONMENTAL SPECIALIST <br />DEPARTMENT OF UTILITY SERVICES <br />BACKGROUND <br />The Department of Utility Services has been required by the U. S. <br />Environmental Protection Agency to apply for NPDES permits for all <br />wastewater treatment plants. The Department has received or will <br />shortly receive a "No Discharge" Permit for the following wastewater <br />treatment plants: <br />West Regional <br />Gifford <br />Vista Royale <br />Vista Gardens <br />Laurelwood <br />River Edge <br />Breezy Village <br />Sea Oaks <br />The requirements of these permits are a short one-page report <br />concerning sludge disposal practices, a copy of the FDER mandated <br />sludge analysis, a listing as to sludge quantities generated from <br />each facility, and an analysis of the sludge from each facility as <br />detailed in the Congressional Federal Register. The intent is to <br />track sludge generation nationwide. <br />ANALYSIS <br />The laboratory analyses as detailed are a required sampling in the <br />first year of each permit, as evidenced in the attachment. The cost <br />shall not exceed $10,000.00. These funds were not budgeted during <br />the budget preparatory process, as the first permits were not <br />received until October 1989. Analysis lag time will be <br />approximately 45 days and sampling kit preparation will be <br />approximately 10 days. The Breezy Village facility's sludge has <br />been exempted from analysis, as that facility is to be <br />decommissioned with the North County system construction. <br />RECOMMENDATION <br />The Department of Utility Services recommends that the Board of <br />County Commissioners authorize the spending of not more than <br />$10,000.00 for the required permitted analyses from Account No. <br />471-218-536-033.19 (Other Professional Services - Sewer). This work <br />be performed by the contracted laboratory previously awarded <br />the open contract. <br />rdei e,g <br />71 NOOK <br />
The URL can be used to link to this page
Your browser does not support the video tag.