My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/6/1990
CBCC
>
Meetings
>
1990's
>
1990
>
3/6/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:44 PM
Creation date
6/16/2015 8:51:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/06/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISCELLANEOUS INTERSECTIONS PHASE III -A -- CHANGE ORDER NO. 1 <br />r,. <br />The Board reviewed the following memo dated 2/15/90: <br />------------------------------------------------------- <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director /) <br />FROM: Michelle A. Ge tile, C.E.T. <br />Civil Engineer <br />RE: Miscellaneous Intersections Phase III -A <br />Change Order No. 1 <br />DATE: February 15, 1990 <br />DESCRIPTIONS AND CONDITIONS <br />Lloyd and Associates, Engineer for the 43rd Avenue and Bth <br />Street Intersection and 20th Avenue and 8th Street Intersection <br />is requesting a change order for these intersections. <br />Due to a parcel of property at 8th Street and 43rd Avenue <br />sitting lower than the existing road, the catch basin had to be <br />modified and additional drainage pipe installed to alleviate the <br />possibility of flooding private lands. Also, at the same <br />intersection there was a conflict with an existing water line <br />which required the change in pipe sizes. <br />At 8th Street and 20th Avenue the existing 18" culverts had <br />to be tied into a proposed 60" R.C.P. reinforced concrete pipe to <br />avoid excavating onto private property. <br />The existing 18" C.M.P. was in very bad condition and had to <br />be replaced with R.C.P. reinforced concrete pipe. <br />The total increase to the contract for Change Order No. 1 <br />will be $6,420.00. <br />ALTERNATIVES AND ANALYSIS <br />Staff has reviewed the requested change and concurs with the <br />Change Order as prepared. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that Change Order No. 1 be approved and <br />that the Board of County Commissioners be authorized to execute <br />the Change Order. Funding to be from Account #109-141-541-033.19 <br />ATTACHMENTS <br />Change Order No. 1. <br />DISTRIBUTION <br />Joe Baird, Budget Office <br />Gary Taneri, Lloyd and Associates <br />APPROVED AGENDA ITEM <br />FOR <br />61990 <br />I q'q0 A^nrf,vpd Ja'r. I <br />` Jell. moi`, rL 21 <br />Risk Mgr. <br />0� <br />ur <br />
The URL can be used to link to this page
Your browser does not support the video tag.