Laserfiche WebLink
I <br />LIAR 2 7990 <br />BOOK A P�Sut <br />Wheeler and, upon being put to a vote, the vote <br />was as follows: <br />Chairman Carolyn K. Eggert A e <br />Vice Chairman Richard N. Bird Ayre <br />Commissioner Don C. Scurlock, Jr. Aye <br />Commissioner Margaret C. Bowman Aye <br />Commissioner Gary C. Wheeler Aye <br />The Chairman thereupon declared the resolution duly <br />passed and adopted this 27th day of _ March , 1990. <br />BOARD OF COUNTY COMMISSIONERS <br />INDIAN RIVER COUNTY, -FLORIDA <br />By �C <br />Ot�ha°i>V an' Egger <br />E. Public Health Unit - Addtl. Architectural Services <br />The Board reviewed memo from the General Services Director: <br />DATE: MARCH 14, 1990 <br />TO: HONORABLE BOARD OF COUNTY COMMISSIONERS <br />THRU: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: H.T. "SONNY" DEAN, DIRECTOR. <br />DEPARTMENT OF GENERAL SERVICNd*� <br />SUBJECT: INDIAN RIVER COUNTY PUBLIC HEALTH UNIT <br />ADDITIONAL ARCHITECTURAL SERVICES <br />BACKGROUND: <br />After the construction plans were approved and completed, Dr. Berman <br />requested changes in the location of storage cabinets and sinks in <br />the examination rooms of the subject building, to allow better use of <br />the space provided. He also requested a change in locating the <br />environmental lab to the second floor of the structure. The lab <br />change was promulgated by the State in that the clinic lab and <br />environmental lab could not be combined. <br />It was also necessary to make changes in the original 1986 landscape <br />plans for this project as required by the City of Vero Beach. This <br />was promulgated by a change in the original ordinance. <br />ANALYSIS: <br />These changes resulted in additional services for, the architect and <br />his engineers to change the drawings to incorporate the required and <br />requested changes. This is covered in Section 1.7.6 and 1.7.12 of <br />the contract between the owner and architect. <br />10 <br />