Laserfiche WebLink
APR 3 1990 <br />BOOK A F4,E'16 <br />Director Pinto explained that if he hooked up, he would have <br />to pay the base minimal fee of $7.16 per month, and Commissioner <br />Scurlock felt it would be wise for owners of undeveloped lots to <br />pay their impact fees now since an increase is expected, but <br />mostly because they would be reserving capacity in the plant and <br />would be assured of water when they do develop. <br />Mr. Green wished to point out that the State is responsible <br />for 25 feet off the concrete at the entrances to their streets <br />from AIA. He has been after them a number of times, but they say <br />they do not fill holes and only put down sod. He felt that some <br />of the tearing up at the entrances is because the State is not <br />doing their job along there. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously <br />adopted Resolution 90-42 confirming the special <br />assessments in connection with a potable water <br />distribution system located in Summerplace and Spring <br />Place and providing for special assessment liens to be <br />made of record; and authorized staff to obtain <br />easements in Summerplace west and Spring Place after <br />the completion of construction, as was done on the east <br />side of Summerplace (east of AIA), as recommended by <br />staff. <br />ASSESSMENT ROLL IS ON FILE IN THE OFFICE OF THE CLERK TO <br />THE BOARD <br />36 <br />