My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/17/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
09/17/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:35:55 PM
Creation date
3/23/2016 9:01:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/17/2013
Meeting Body
Board of County Commissioners
Book and Page
193
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NM.tif
SmeadsoftID
14227
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File#1351 <br /> 9/5/2013 <br /> ® <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> AMENDMENT #1 TO WO #6 <br /> "EXHIBIT 1" <br /> SEWER FEASIBILITY FOR NORTH SEBASTIAN AREA <br /> (Scope of Work) <br /> • Proiect Description <br /> Masteller & Moler, Inc. (MM) is pleased to present you with Amendment #1 to Work Order #6. <br /> Work Order #6 was approved by the Board of County Commissioners on August 20, 2013. Work <br /> Order #6 provides for professional engineering services in connection with preparation of a Sewer <br /> Feasibility Study and Report related to replacement of septic tank systems along or within close <br /> proximity to the Indian River Lagoon. The Feasibility Study and Report covered an area generally <br /> described as having a western limit of US Highway#), an eastern limit of the Indian River Lagoon, <br /> the Northern Limit of Indian River Drive connection to US Highway #1, and the Southern Limit as <br /> Main Street. <br /> Amendment #1 to Work Order #6 covers a study area to be added to the Feasibility Study and <br /> Report. The additional study area borders the southern shore line of the Saint Sebastian River. <br /> This study area is presently developed with residential uses served by existing septic systems. The <br /> study area can be described as the community of Ercildoune Heights plus approximately 100 acres <br /> north of Roseland Road bordered by Kelso Place on the east, 128th Court to the west, Roseland <br /> Road to the south, and the shoreline of the Saint Sebastian River to the north. Consistent with the <br /> objective of original Work Order # 6, the Feasibility Study and Report amended by the inclusion of <br /> this study area will provide design and cost information for the construction of a sanitary sewer <br /> gravity system to replace the existing septic systems. Pollution of groundwater by existing septic <br /> systems that migrates into the Saint Sebastian River will be eliminated due to the construction of <br /> these sanitary gravity sewers. <br /> • Scope of Services <br /> The Scope of Services as originally outlined in Work Order#6 will also apply to this Amendment#1. <br /> Even though the two (2) study areas (the original study area as covered under Work Order#6 and <br /> the additional study area as covered under this Amendment# 1) are not contiguous, the report will <br /> evaluate the two (2) study areas as one (1) project. The objective of eliminating the use of septic <br /> systems which cause pollution of the Indian River Lagoon and Saint Sebastian River is a common <br /> goal of both study areas. It is anticipated that the Sanitary Sewer Feasibility Study and Report will <br /> be used as a key element in making application for future funding assistance needed to construct <br /> this much needed sewer project. <br /> 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.