My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/17/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
09/17/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:35:55 PM
Creation date
3/23/2016 9:01:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/17/2013
Meeting Body
Board of County Commissioners
Book and Page
193
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NM.tif
SmeadsoftID
14227
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br /> PROFESSIONAL ROOF EVALUATION SERVICES FOR THE EXISTING <br /> COUNTY ADMINISTRATION COMPLEX ROOF BUILDINGS A AND B <br /> CONSULTANT AGREEMENT <br /> THIS AGREEMENT, entered into this day of September 2013 between INDIAN RIVER <br /> COUNTY, a Political subdivision of the State of Florida, 1801 27th Street, Vero Beach, FL. 32960, <br /> hereinafter referred to as the COUNTY, and C.B Goldsmith and Associates 13101 56th Ct. North, Suite <br /> 801, Clearwater Florida 33760, hereinafter referred to as the CONSULTANT. <br /> WITNESSETH <br /> The COUNTY and the CONSULTANT, in consideration of their mutual covenants, herein agree with <br /> respect to the performance of professional architecture; structural, electrical, and mechanical engineering; <br /> construction budgeting, contract documents, and related services by the CONSULTANT, and the <br /> payment for those services by the COUNTY, as set forth below. This Agreement shall be referred to as <br /> the "CONSULTANT AGREEMENT". <br /> The CONSULTANT shall provide professional consultant services including: <br /> EVALUATION and RECOMMENDATION STATEMENT: <br /> 1. Original Design. Review the original design documents to understand the intent of the roof <br /> F` systems as designed. This would include the original plans, specifications, addenda, construction <br /> phase documents,and any other documents relating to the roof design. <br /> 2. Prior Evaluations. Review prior evaluations of the roofs to understand the issues which have been <br /> identified to date. Currently,two reports are available: <br /> American Roof Technology report submitted February 29,2008 <br /> Architecture Roof Consulting(ARC Associates) dated November 7,2011 <br /> 3. Field Investigation. Conduct an on-site field investigation of both Buildings A and B to evaluate <br /> the existing roofs and to identify any material deficiencies in the design or construction of the roof <br /> systems. The field investigation shall be thorough and shall include testing, to the extent necessary <br /> and approved by the Owner,to support the conclusions reached. <br /> 4. Evaluation Statement. Produce an evaluation statement which (a) describes in detail the conditions <br /> found during the field investigation, including identification of all material deficiencies, and (b) <br /> recommends corrective action which eliminates all material deficiencies, so the Owner will have a <br /> watertight roof system, consistent with industry standards and applicable codes,with an expected life <br /> of 25-30 years. <br /> Page 1 of 9 <br /> FAPublic Works\Luanne M\Facilities ManagementWdmin Complex Re-Roof'Agreement with Goldsmith v3 09-09-13.doc 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.