My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/14/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
10/14/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 11:33:51 AM
Creation date
3/23/2016 9:19:32 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/14/2014
Meeting Body
Board of County Commissioners
Book and Page
125
Subject
Part 1 October 14, 2014 Agenda Pk
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000L\S00060B.tif
SmeadsoftID
14731
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />CONSENT <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />FROM: Christopher J. Kafer, Jr., P.E., County Engineef . <br />SUBJECT: Award of Bid No: 2014045 <br />69th Street Bridge over the Indian River Farms Water Control District <br />(IRFWCD) Lateral G Canal IRC Project No. 1363 <br />DATE: September 30, 2014 <br />DESCRIPTION AND CONDITIONS <br />The Florida Department of Transportation (FDOT) routinely inspects all of the bridges in the <br />County. The FDOT sent a "Significant Deficiency Letter" dated October 18, 2013 which outlined <br />the deficiencies of the 69th Street Bridge over the IRFWCD Lateral G Canal that were observed <br />during their inspection of October 9, 2013. The FDOT letter recommended corrective action to <br />repair the bridge, which was constructed in 1961. <br />Staff coordinated with IRFWCD to explore a less expensive option than the construction of a <br />replacement bridge. IRFWCD determined that a reinforced concrete culvert was adequate <br />under 69th Street to handle the water from the watershed area. <br />The proposed improvements will include removal of the existing 2 -lane bridge on 69th Street <br />over the IRFWCD Lateral G Canal and replacement of the existing bridge with a 96" reinforced <br />concrete pipe (RCP) culvert. Also included with the project is installation of a 60" RCP culvert in <br />the IRFWCD Sub -lateral G-4 canal. <br />The bid opening was held on September 24, 2014. Nine (9) bids were received and opened. A <br />detailed bid tabulation is on file and available for viewing in the County Engineering Division. <br />Bid totals are as follows: <br />Melvin Bush Construction, Inc. <br />Johnson Davis, Inc. <br />Timothy Rose Contracting, Inc. <br />Guettler Brothers Construction, LLC <br />Mancil's Tractor Service, Inc. <br />Ranger Construction Industries, Inc. <br />*Blue Goose Construction <br />Douglas Higgins, Inc. <br />Close Construction, LLC <br />Port St. Lucie, Florida <br />Lantana, Florida <br />Vero Beach, Florida <br />Fort Pierce, Florida <br />Stuart, Florida <br />Fort Pierce, Florida <br />Fort Pierce, Florida <br />Ann Arbor, Michigan <br />Okeechobee, Florida <br />* Denotes mathematical error was found and bid amount corrected. <br />$224,228.88 <br />$233,566.00 <br />$255,248.42 <br />$279,379.00 <br />$317,258.00 <br />$324,228.60 <br />$390,059.25 <br />$413,974.00 <br />$434,324.00 <br />29 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11363-69th St Bridge @ lat G Canal -Culvert InstallWdmin\agenda items\BCC Agenda Award of Bid 10- <br />14-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.