Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project consists of removal of the existing 2 -lane bridge on 69th Street <br />over the Indian River Farms Water Control District (I.R.F.W.C.D.) Lateral G Canal and <br />replacement of the existing bridge with a 90" Reinforced Concrete Pipe (RCP) culvert. <br />Also included in the project is installation of a 72" Reinforced Concrete Pipe (RCP) <br />culvert in the I.R.F.W.C.D. Sub -lateral G-4 Canal and related other improvements. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 69th Street Bridge over I.R.F.W.C.D. Lateral G <br />County Project Number: 1363 <br />Bid Number: 2014045 <br />Project Address: 69th Street, Indian River County, Florida <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 04-07 SAMPLE <br />00520 - 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS11363-69th St Bridge © Lat G Canal -Culvert InstallWdmin\agenda items\00520 - Agreement (Public Works) REV 04-07 <br />SAMPLE.doc <br />32 <br />