My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/14/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/14/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 11:34:18 AM
Creation date
3/23/2016 9:20:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/14/2014
Meeting Body
Board of County Commissioners
Book and Page
160
Subject
Impact Fees
Part II October 14 Agenda Pk
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000L\S00060D.tif
SmeadsoftID
14733
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2014 - <br />EXHIBIT "B" <br />Public Benefits: <br />For all PD projects, applicants must identify the public benefits that the project will provide in <br />exchange for requested waivers or incentives being sought by the applicant. For the Reserve at <br />Vero Beach Mixed Use, the public benefits are as follows: <br />Right -of -Way Dedications: None are required as proposed with this development. <br />Off-site College Lane Sidewalks: The applicant is proposing to build an off-site <br />sidewalk improvement that fills in the existing College Lane sidewalk gap between the <br />subject site and the 58th Avenue sidewalk. This off-site improvement will provide <br />pedestrian access for residents and commercial customers of the subject project as well <br />as students from the adjacent charter school and nearby IRSC Mueller Campus. This <br />improvement provides for the project's integration into the area's existing/planned <br />pedestrian system. <br />Transit Stop & Shelter: The applicant will be responsible for providing a transit stop <br />and shelter on SR 60 in front of the commercial uses at a location and in a manner <br />approved by MPO staff. Provision of the stop/shelter will integrate the project into the <br />public transportation system. The transit stop and shelter must be constructed or funds <br />escrowed for construction prior to issuance of a certificate of occupancy (C.O.) for the <br />project's first phase. <br />Conditions: <br />4. Any fast food restaurant with a drive through is restricted to the easternmost and middle <br />commercial parcels (commercial Lots 2 and 3). <br />5. Construction on commercial Lot 2 shall not commence until construction has started on <br />25% (40 units) of the project's total number of residential units. <br />F:\Community Development\CurDev\Ordinances\2014\2014-Reserveatverobch.dATTACHMENT <br />3 <br />200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.