My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/07/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/07/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 4:58:52 PM
Creation date
3/23/2016 9:08:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/07/2014
Meeting Body
Board of County Commissioners
Book and Page
452
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005AQ.tif
SmeadsoftID
14458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverable F: One electronic submission of the RAI responses. <br />Total Cost: $7,967 ($3,983.50 — DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable G: One electronic submission of the final construction plans and specifications. <br />Total Cost: $12,498 ($6,249 — DEP funds). <br />Due Date: January 30, 2017. <br />3.0 Construction <br />Work performed and costs associated with the placement of fill material and/or the construction of erosion control <br />structures within the project area. Eligible costs may include mobilization, demobilization, construction <br />observation or inspection services, beach fill, tilling and scarp removal, erosion control structures, dune <br />stabilization measures and native beach -dune vegetation. Construction shall be conducted in accordance with any <br />and all permits issued by the Department. <br />Performance Standard: Work products (Deliverables) must meet acceptance standards of the engineer, building <br />code inspector, Joint Coastal Permit, or a combination of these, as required, to assure all project -related <br />construction is completed to desired specifications. <br />3.1 Emergency Dune Nourishment- Orchid Beach <br />In coordination with Indian River County, the Town of Orchid Beach awarded a construction contract to the lowest <br />qualified bidder for emergency dune stabilization for the Orchid Beach section of the Sector 3 Project to address <br />damages sustained during Hurricane Sandy. Eligible costs include mobilization, demobilization, beach fill, permit <br />compliance, beach tilling, and native beach -dune vegetation. The Town and the County have an interlocal <br />agreement to provide reimbursement to the Town, who acted on behalf of the county during the emergency <br />situation. <br />Deliverable A: Copy of All Periodic Certified Pay invoices as submitted by Contractor and approved by The Town <br />of Orchid. <br />Total Cost: $270,393 ($135,196.50 — DEP funds). <br />Due Date: January 30, 2017. <br />3.2 Emergency Dune Nourishment- Wabasso and Golden Sands <br />Indian River County awarded a construction contract to the lowest qualified bidder for Emergency dune <br />stabilization for the Wabasso and Golden Sand Project to repair damages sustained during Hurricane Sandy. <br />Eligible Costs include mobilization, demobilization, beach fill, permit compliance monitoring, nest relocation, <br />beach tilling, and native beach -dune vegetation. <br />Deliverable A: Copy of All Periodic Certified Pay Invoices as submitted by Contractor and approved by County <br />for the Wabasso repair. <br />Total Cost: $32,865 ($16,432.50 — DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable B: Copy of All Periodic Certified Pay Invoices as submitted by Contractor and approved by County <br />for the Golden Sands repair. <br />Total Cost: $42,286 ($21,143 — DEP funds). <br />Due Date: January 30, 2017. <br />DEP Agreement No. 14IR2, Amendment No. 1, Attachment A-2, Page 2 of 3 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.