Laserfiche WebLink
External Pedestrian Improvements: A five-foot wide sidewalk is required along the <br />site's 58th Avenue frontage and an 8' sidewalk is required along the site's 33rd Street <br />frontage. The sidewalks will need to be constructed or bonded -out prior to the <br />issuance of a certificate of completion for the phase the sidewalk is included (phase 1 <br />for 33rd Street and phase 3 for 58th Avenue), as approved by Public Works. <br />Internal Pedestrian Improvements: The development will have sidewalks along both <br />side of all streets. These sidewalks will provide an internal pedestrian system for the <br />project, connecting individual lots, common areas, and the clubhouse/recreation tract <br />to each other and to the external public sidewalk network. More sidewalk details will <br />be provided with the preliminary PD plan, and sidewalks will be provided consistent <br />with the provisions of the Chapter 913 subdivision regulations. <br />Drainage for Thoroughfare Plan Roads: As part of the PD process, staff requested that <br />the applicant provide drainage capacity in the project's stormwater system for the <br />future widening of 58th Avenue and 33rd Street. The applicant has agreed in concept to <br />provide drainage capacity for those future widening improvements. Drainage rights <br />will need to be dedicated via the project's final plats. <br />Recreation Improvements: The applicant is proposing a clubhouse, community pool, <br />and recreation courts (tennis, pickle ball) to provide for project recreational <br />improvements. To ensure that the proposed recreation improvements are provided <br />early in project development, staff is recommending a condition requiring completion <br />of the community pool and a clubhouse (minimum enclosed building area of 5,000 sq. <br />ft.) prior to the issuance of a certificate of completion for phase 2. <br />Enclave Parcels/Albrecht Acres: The three enclave parcels located in the northern part <br />of the project site are part of Albrecht Acres, a subdivision which was platted in 1946 <br />but never formally developed. The Harmony Reserve project will re -plat the vast <br />majority of Albrecht Acres. Through the PD final plat process, the Harmony Reserve <br />re -plats that affect portions of Albrecht Acres will need to be structured so as not to <br />eliminate or interfere with any of the rights afforded by the original plat that provide <br />for access and services to the enclave parcels. <br />15. Type of Homes: The applicant is proposing all single story homes, with a variety of <br />architectural styles. In addition, the project lay -out intermixes 50' and 65' wide lots to provide <br />a mix of unit types along all street segments. PD regulations found in section 915.14(5) <br />provide a series of architectural and design guidelines for residential development designs in <br />order to encourage unit variation and reduce visual monotony within the project. The <br />applicant has submitted preliminary home designs to show how the PD "anti -monotony" <br />criteria are met. Preliminary architectural building elevations and guidelines are attached (see <br />attachment #4). Staffs determination is that the project's conceptual architectural guidelines <br />meet applicable "anti -monotony" criteria. The applicant will be required to demonstrate that <br />these criteria are met through the preliminary PD plan and future project submittals. <br />Most project perimeters abut single -story residential development. To ensure compatibility <br />with the surrounding area, the applicant has agreed and staff is recommending that all <br />perimeter lots be restricted to one story homes. <br />F:\Community Development\CurDev\BCC\2014 BCC\HannonyReservePD-14-06-05ConcepRpt.rtf <br />12 <br />143 <br />