My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/18/2014 (7)
CBCC
>
Meetings
>
2010's
>
2014
>
11/18/2014 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 12:42:29 PM
Creation date
3/23/2016 8:53:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/18/2014
Meeting Body
Board of County Commissioners
Book and Page
410
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004AE.tif
SmeadsoftID
14159
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Major site plan and preliminary plat approval conditions: <br />That prior to site plan release, the applicant shall obtain: <br />a. Approval from Traffic Engineering for the design of all off-site improvements, <br />b. Approval of a developer's agreement for paving 90t" Avenue, <br />C. Partial release of the Murphy Act easement, <br />d. Staff approval of final building elevations that satisfy all SR60 corridor require <br />e. Environmental Planning approval of the upland mitigation, wetland miti <br />mitigation plans. <br />2. That prior to the issuance of a Certificate of Occupancy, the applicant shall: <br />3 <br />4 <br />ts, and <br />, and tree <br />Provide driveway stub outs to the adjacent properties as depicted on the approved Ian, <br />Complete all required buffers as depicted on the approved plan, <br />Construct all required sidewalks, <br />Complete all off-site traffic improvements as specified in section 8 of this report, <br />Grant the required conservation easements and a construction easement for tl- <br />interconnections. <br />Prior to issuance of a Certificate of Occupancy or as established in the developer's <br />Avenue shall be paved to 22nd Street. <br />Building elevations for the out -parcel development shall be reviewed for compliance with S <br />requirements through the administrative approval process. <br />driveway <br />corridor <br />FACommunity Deve1opment\CurDev\BCC\2014 BCCCrheShoppesatVBconditions.rtl 97 <br />ATTACHMENT 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.