My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/16/2014 (6)
CBCC
>
Meetings
>
2010's
>
2014
>
12/16/2014 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 10:01:46 AM
Creation date
3/23/2016 9:07:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/16/2014
Meeting Body
Board of County Commissioners
Book and Page
321
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0004S5.tif
SmeadsoftID
14301
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Summerlin's <br />Marine Construction, LLC (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br />Removal of southernmost dock and repair of middle dock at Boat Club Island (Spoil Island IR -25) <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: Removal/Repair of Docks at Boat Club Island (Spoil Island IR -25) <br />RFP Number: 2014040 <br />Project Location: +1/2 mile NE of Grand Harbor Marina in IRL, Vero Beach, FL <br />ARTICLE 3 —TERM AND CONTRACT TIMES <br />3.01 Term: This Agreement shall remain in effect for a term of one (1) year, unless otherwise sooner <br />terminated by mutual consent of the parties. <br />3.02 Time of Completion: Project shall be completed, to include approval by the Building Division 30 <br />days from receipt of the Notice to Proceed. <br />ARTICLE 4 - CONTRACT PRICE <br />4.01 OWNER shall pay CONTRACTOR for completion of the Work an amount in current funds equal to <br />the sum of the amounts determined pursuant to paragraph 4.01.A and summarized in paragraph 4.01.B, <br />below: <br />A. For all Work, at the prices stated in CONTRACTOR's Proposal, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract Documents: <br />Numerical Amount: $18,650.00. <br />Written Amount: Eighteen thousand six hundred and fifty dollars and 00/100. <br />Page 1 of 7 <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.