My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/16/2014 (6)
CBCC
>
Meetings
>
2010's
>
2014
>
12/16/2014 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 10:01:46 AM
Creation date
3/23/2016 9:07:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/16/2014
Meeting Body
Board of County Commissioners
Book and Page
321
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0004S5.tif
SmeadsoftID
14301
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHJTECTURAL/ENGINEERiNG PROPOSAL FOR A <br />HELICOPTER HANGER BUILDING AND HELIPAD <br />VERO BEACH, FLORIDA <br />November 26, 201)4 <br />Page 2 <br />2. Mechanical/Electrical Engineering — Preparation of Construction Documents to include the following: <br />A. Coordination with Donadio & Associates, Architects, P.A. <br />B. Establish design criteria for heating, ventilation and air conditioning (HVAC), electrical, plumbing <br />and fire protection. <br />C. Construction documents and specifications for HVAC, electrical and plumbing, fire protection, which <br />include but are not limited to: floor plans, schedules, electrical and plumbing risers, electrical panels, <br />details, etc. <br />D. Signed and sealed documents for Building Permit Submittal. <br />E. Florida Energy Calculations. <br />F. Bidding assistance and responding to building permit review comments. <br />G. Submittal review of MEPFP items. <br />H. Periodic Construction Observation. <br />3. Structural Engineering — Preparation of Construction Documents to include the following: <br />A. Coordination with Donadio & Associates, P.A. <br />B. Establish structural design criteria. <br />C. Review of soil investigative report as provided by Owner. <br />D. Structural design and preparation of documents to include the following: <br />i. Foundations design based on a conventional foundation system with a minimum allowable <br />soil bearing capacity as stated in the soil investigation report. <br />ii. <br />RoofFraming plans. <br />iii. Building and Wall Sections, Details and Specifications. <br />E. Signed and sealed documents for Building Permit Submittal. <br />F. Bidding assistance and responding to building permit review comments. <br />G. Submittal review of Structural items. <br />H. Periodic Construction Observation <br />4. Civil Engineering — Preparation of Construction Documents to include the following: <br />A. Coordination with Donadio & Associates, P.A. <br />B. Development of Preliminary Site Plan. <br />C. Pre -Application, Site Plan Approval & Special Exception Use Submittal. <br />D. Helipad Design and FAA Permitting. <br />E. Construction Documents and Specifications. <br />F. Application Process for required Permits <br />G. Bidding assistance and responding to Site Plan Approval and Building Permit review comments. <br />H. Submittal review of Civil Site Work items. <br />I. Construction Observation, Daily and Periodic Inspections of Erosion Control Devices and <br />Certification of Construction Completion. <br />5. ,Landscape Architecture - Preparation of Construction Documents to include the following: <br />A. Coordination with Donadio & Associates, Architects, P.A. <br />B. Establish design criteria for Landscape and Irrigation. <br />C. Development of Preliminary Landscape and Irrigation Plan. <br />D. Construction documents and specifications for landscaping, irrigation, planting details, etc. <br />E. Signed and sealed documents for Site Plan Approval and Building Permit Submittal. <br />F. Bidding assistance and responding to building permit review comments. <br />G. Submittal review of Landscape and Irrigation items. <br />H. Periodic Construction Observation. <br />6. Cost Consultant —Preparation of Construction Cost Estimates to establish project budgets for Schematic <br />Design and 50% Construction Document Phases. <br />'- F.1y1i i�- <br />c'. ...:,:sociaies, Architects, P.A. <br />79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.