Laserfiche WebLink
CONSENT <br /> INDIAN RIVER COUNTY, FLORIDA EMER mM <br /> March 11, <br /> MEMORANDUM Agenda Item <br /> II •A . <br /> TO: Joseph A. Baird, County Administrator <br /> THROUGH: Christopher R. Mora, P.E., Public Works Direc <br /> Christopher J. Kafer,Jr., P.E., County Engine <br /> Michael D. Nixon, P.E., Roadway ProductionPanaagger <br /> FROM: Etienne B. Bourgeois, P.E., Project Engineer,% '� -D <br /> SUBJECT: Award of Bid No: 2014026 <br /> Indian River County Public Shooting Range <br /> Improvements to Skeet &Trap Facility Phase 1 <br /> IRC Project No. 1213 <br /> DATE: March 7, 2014 <br /> DESCRIPTION AND CONDITIONS <br /> The proposed improvements to Phase 1 of the Indian River County Public Shooting Range <br /> include mulching of the sporting clays trails, construction of a new concrete wall and minor <br /> regrading to create a small action pistol range, repairs to 2 rifle range baffles, placement of fill <br /> material to create a large action pistol range with 20'tall berms, and stormwater management <br /> improvements. <br /> The bid included two (2) alternate bids. Alternate Bid #1 entertains an alternate unit price for <br /> County owned embankment material stockpiled at the County Fairgrounds, should the County <br /> haul the material to the site. Alternate Bid #2 removes the large action pistol range, its <br /> associated stormwater management improvements,and the majority of the mulching from the <br /> construction. Alternate Bid #2 was added to the Request for Bids due to agency approval <br /> constraints stemming from the impacts to wetlands caused by the large action pistol range <br /> footprint.The Shooting Industry Masters event organizers have confirmed that the construction <br /> of the Alternate Bid #2 items will satisfy the requirements of the event. <br /> Construction of the items in Alternate Bid #2 will be completed in time-to host the Shooting <br /> Industry Masters event and will allow Indian River County to quickly transition into construction <br /> of Phase 2, including the Skeet & Trap buildings and fields, following the event with the <br /> remaining funds allocated to this project. <br /> I11.�t - I. <br /> F:\Public Worksv ENG IN EER ING DIVISION PROJECTS,1213 IRC Shooting RangeSkeet&Trap Improvemnts&Hunters Crain BldglAdmimwagenda itemsBC'C <br /> Agenda Award of Bid 03-11-14 doc <br />