Laserfiche WebLink
SECTION 00520 -Agreement(Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> This project involves all work necessary to construct improvement to the <br /> Indian River County Shooting Range as depicted in the construction,drawings prepared <br /> by Donadio & Associates, Architects, P.A.'The improvements"include but are not limited <br /> to, clearing & grubbing, filling, mulching, andsodding, construction of earthen berms, a <br /> concrete wall, and a raised/dry pathway for the specific purpose of developing two new <br /> action pistol ranges and a sporting clay shooting trail. Work on this project must comply <br /> with all local, state, and federal regulating agency criteria and permits. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: Indian River County Public Shooting Range — Skeet and Trap <br /> Facility Improvements (Phase 1) <br /> County Project Number: 1213 <br /> Bid Number: 2014026 <br /> Project Address: 10455 102nd Terrace, Sebastian, Florida <br /> ARTICLE 3— ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> 00520-Agreement(Public Works)SAMPLE <br /> 00520-2 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range-Skeet&Trap Improvemnts 8 Hunters Train Bldg\Admim\agenda items\00520-Agreement <br /> (Public Works)SAMPLE.doc <br />