My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/11/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
03/11/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 3:25:11 PM
Creation date
3/23/2016 8:45:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/11/2014
Meeting Body
Board of County Commissioners
Book and Page
214
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VB.tif
SmeadsoftID
13692
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
low <br /> Presentation at a regularly scheduled meeting of an advisory board, with duties <br /> related to park, recreation and leisure service activities: 10 points <br /> Presentation to community organizations or neighborhood associations, or taking of <br /> written opinion surveys: 5 points <br /> (h) Project is located on or connects with a National Scenic Trail or National Recreation <br /> Trail: 3 points <br /> (i) Project is located on or connects with a State of Florida Designated Greenway or Trail: <br /> 3 points <br /> (j) Matching Ratio (federal grant amount : grantee's cash and/or in-kind services) <br /> 50:50 5 points <br /> 60:40 3 points <br /> 80:20 1 point <br /> (k) The specific trail design demonstrates that the project will support recreational trail <br /> opportunities for both motorized and nonmotorized use through innovative techniques such <br /> as multiple trails sharing a single corridor, or time sharing of trails or trailhead facilities: <br /> 5 points <br /> (1) The specific trail design demonstrates that the project will support mixed-use <br /> recreational trail opportunities, either motorized or nonmotorized, through innovative <br /> techniques: 3 points <br /> (3) Specific Criteria for Motorized Trail Projects. <br /> (a) The motorized trail project will: (select only one) <br /> Develop new motorized trails: 10 points <br /> Repair or restore designated motorized trails impacted by normal use: 8 points <br /> . <br /> 15 <br /> lw <br /> 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.