My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/11/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
03/11/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 3:25:11 PM
Creation date
3/23/2016 8:45:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/11/2014
Meeting Body
Board of County Commissioners
Book and Page
214
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VB.tif
SmeadsoftID
13692
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County as OWNER, and the County as OWNER shall promptly make payment to the <br /> CONTRACTOR unless such amounts are the subject of a good faith dispute; the subject <br /> of a claim pursuant to Florida Statutes section 255.05(2005); or otherwise the subject of a <br /> claim or demand by the County as OWNER or the CONTRACTOR. The CONTRACTOR <br /> acknowledges that where such retainage is attributable to the labor, services, or materials <br /> supplied by one or more subcontractors or suppliers, the Contractor shall timely remit <br /> payment of such retainage to those subcontractors and suppliers. Pursuant to Florida <br /> Statutes section 218.735(8)(c)(2005), CONTRACTOR further acknowledges and agrees <br /> that: 1) the County as OWNER shall receive immediate written notice of all decisions <br /> made by CONTRACTOR to withhold retainage on any subcontractor at greater than five <br /> percent (5%) after fifty percent (50%) completion; and 2) CONTRACTOR will not seek <br /> release from the County as OWNER of the withheld retainage until the final pay request. <br /> 5.3 Paragraphs 5.1 and 5.2 do not apply to construction services work purchased by the <br /> County as OWNER which are paid for, in whole or in part, with federal funds and are <br /> subject to federal grantor laws and regulations or requirements that are contrary to any <br /> provision of the Local Government Prompt Payment Act. In such event, payment and <br /> retainage provisions shall be governed by the applicable grant requirements and <br /> guidelines. <br /> 5.4 ACCEPTANCE AND FINAL PAYMENT: Upon receipt of written notice that the work is <br /> ready for final inspection and acceptance, the ENGINEER will promptly make such <br /> inspection and when the ENGINEER finds the work acceptable under the terms of the <br /> Contract and the Contract fully performed, the ENGINEER will promptly issue a final <br /> completion certificate stating that the work provided for in this Contract has been <br /> completed, and acceptance by the OWNER under the terms and the conditions thereof is <br /> recommended and the entire balance found to be due the CONTRACTOR, will be paid to <br /> the CONTRACTOR by the OWNER following County Commission approval of the final <br /> ,,a„ Contract payment. <br /> 5.5 Acceptance of Final Payment as Release. The acceptance by the CONTRACTOR of final <br /> payment shall be and shall operate as a release to the OWNER from all claims and all <br /> liability to the CONTRACTOR other than claims in stated amounts as may be specifically <br /> excepted by the CONTRACTOR for all things done or furnished inconnection with the <br /> work under this Contract and for every act and neglect of the OWNER and others relating <br /> to or arising out of the work. Any payment, however, final or otherwise, shall not release <br /> the CONTRACTOR or its sureties from any obligations under the Contract Documents or <br /> the Payment and Performance Bonds. <br /> ARTICLE 6 INTEREST <br /> Not Applicable, <br /> ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations: <br /> 7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents, work, site, locality, and all local conditions and laws and regulations that in <br /> any manner may affect cost, progress, performance or furnishing of the work. <br /> 7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> -- conditions and drawings of physical conditions which are identified in the Supplementary <br /> 00530-4 <br /> 74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.