My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/04/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
03/04/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:47:20 PM
Creation date
3/23/2016 8:45:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/04/2014
Meeting Body
Board of County Commissioners
Book and Page
221
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VA.tif
SmeadsoftID
13691
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
View images
View plain text
CONSENT <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />FROM: Christopher J. Kafer, Jr., P.E., County Engine <br />SUBJECT: Change Order No. 1 and Release of Retainage <br />CR 512 Resurfacing (East Bound) Roseland Road to Easy Street <br />IRC Project No. 1132 FDOT SCOP FM No. 427572-1-58-01 <br />DATE: January 16, 2014 <br />DESCRIPTION AND CONDITIONS <br />On May 14, 2013, the Indian River County Board of Commissioners awarded Bid No. 2013006 to <br />Ranger Construction Industries, Inc. to refurbish (full depth reclamation) dual eastbound lanes <br />of CR512 from Roseland Road to Easy Street. Also included with the project is the installation of <br />vehicular detector assemblies and the signing and marking of the resurfaced eastbound lanes. <br />This is a F.D.O.T. Small County Outreach Program (SCOP) funded project, FM No. 427572-1-58- <br />01. The SCOP Grant will provide 75% of the cost of the project, up to $749,841.00 and the <br />County will fund the remaining amount. <br />Change Order No. 1 is to make final adjustments to bid line items to decrease the total contract <br />price by $160,699.45 for a final contract price of $889,088.25. <br />Ranger Construction Industries, Inc. has been paid $844,633.84 to date, with $44,454.41 held in <br />retainage. Ranger Construction Industries, Inc. has completed the project and submitted Pay <br />Application No. 5 in the amount of $44,454.41 for release of retainage. <br />FUNDING <br />Funding for this project is budgeted and available from a Small County Outreach Program Grant <br />(SCOP) of $666,816.19 (75% of $889,088.25) The balance of $222,272.06 will come from <br />Secondary Roads and Bridges/ CR 512 Resurfacing (East Bound Only) Roseland Road to Easy <br />Street, Acct # 10921441-053360-12005. Payment for Ranger Construction Industries, Inc. Pay <br />Application No. 5 is budgeted and available from Account No. 109-206000-12005 CR512 <br />Eastbound Road Resurfacing Retainage in the amount of $44,454.41. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1132 -CR 512 Ebnd Resurfacing Roseland Rd to Easy St -SEE PROJ 0926\Admim\agenda items\BCC <br />Agenda Change Order No. 1 Release Retainage 03-04-2014.doc <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).