CR512 Resurfacing (Roseland Road to Easy Street)
<br />e
<br />0.00
<br />0.00
<br />378.00
<br />§ 0
<br />2 o«
<br />7
<br />0.00
<br />-7,952.70
<br />j
<br />^
<br />j
<br />7§§
<br />° °
<br />-197.40
<br />§ `
<br />807.00
<br />30.80
<br />422.65
<br />-253.80
<br />q§ 7§/
<br />37,821.00
<br />0.00
<br />0.00
<br />-3,787.00
<br />,
<br />-47.00
<br />Y. MATERIALS
<br />§§§ 7 7
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />7 2§§§ 2
<br />f
<br />100.00%
<br />100.00
<br />80.00
<br />100.007
<br />100.00%
<br />K(((Ktt(§K
<br />« ) ! y : §
<br />(k)
<br />/ § : ° )51
<br />; @ ;
<br />k
<br />TOTAL COMPLETED
<br />51,500.00
<br />47,000.00
<br />1,512.00
<br />11,000.00
<br />142,527.75
<br />130,658.25
<br />155,241.80
<br />199,596.60
<br />28,548.20
<br />4,199.65
<br />93,000.00
<br />450.00
<br />840.00
<br />1,373.40
<br />0.00
<br />0.00
<br />9,023.00
<br />728.20
<br />299.60
<br />1.00
<br />1.00
<br />24.00
<br />1.00
<br />32,765.00
<br />49,305.00
<br />31,682.00
<br />31,682.00
<br />12,642.00
<br />1,183.00
<br />3.00
<br />1.00
<br />2.00
<br />327.00
<br />0.00
<br />0.00
<br />9,023.00
<br />331.00
<br />56.00
<br />2,280.00
<br />THIS PERIOD
<br />2 | § !
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />}\
<br />3\
<br />\
<br />51,500.00
<br />47,000.00
<br />1,512.00
<br />11,000.00
<br />142,527.75
<br />130,658.25
<br />155,241.80
<br />199,596.60
<br />26,548.20
<br />4,199.65
<br />93,000.00
<br />0\
<br />1,373.40
<br />0.00
<br />0.00
<br />9,023.00
<br />728.20
<br />299.60
<br />k
<br />!
<br />1.00
<br />24.00
<br />1.00
<br />32,765.00
<br />a a a a£g
<br />7.
<br />\-
<br />1.00
<br />2.00
<br />327.00
<br />9,023.00
<br />331.00
<br />56.00
<br />47,000.00
<br />1,890.00
<br />11,000.00
<br />142,527.75
<br />230,883.90
<br />155,241.80
<br />199,596.60
<br />18,595.50
<br />20,959.20
<br />93,000.00
<br />1,176.00
<br />226.80
<br />29.40
<br />9,830.00
<br />759.00
<br />722.25
<br />47,000.00
<br />63.00
<br />11,000.00
<br />4.35
<br />2.65
<br />4.90
<br />6.30
<br />2.10
<br />3.55
<br />31,000.00
<br />45000
<br />420.00
<br />4.20
<br />4.20
<br />4.20
<br />1.00
<br />2.20
<br />5.35
<br />781111.1111W1
<br />ROADWAY IMPROVEMENTS
<br />s
<br />! : !
<br />/
<br />!
<br />> !
<br /># 0
<br />&
<br />2
<br />±
<br />! ± _, ,2-_,
<br />%
<br />`
<br />` `
<br />}
<br />\
<br />\ §
<br />`
<br />`
<br />^
<br />° ` }
<br />!
<br />MAINTENANCE OF TRAFFIC
<br />BUSINESS SIGN (<12) (TEMPORARY)
<br />EROSION AND WATER POLLUTION CONTROL
<br />RECLAIMED ASPHALT BASE COURSE (FULL DEPTH
<br />RECLAMATION)
<br />'ASPHALT EMULSION TYPE CSS -1h
<br />SUPERPAVE ASPHALTIC CONCRETE 1' SP -9.5
<br />SUPERPAVE ASPHALTIC CONCRETE 1-1/2' SP -12.5
<br />PERFORMANCE TURF - SODDING (BAHIA OR MATCH El
<br />PERFOR
<br />MANCE TURF -SODDING (ST.
<br />AUGUSTINE/FLORITAM OR MATCH EXISTING)
<br />ECONOLITE VEHICLE DETECTOR ASSEMBLY
<br />SINGLE POST SIGN (<12) (W4 -2R MERGE)
<br />SINGLE POST SIGN (<12) (R3 -7R RIGHT LANE MUST TU
<br />RPM (BI-DIRECTIONAL (WHITE/RED)
<br />RPM (BI-DIRECTIONAL (AMBER/AMBER)
<br />RPM (BI-DIRECTIONAL (WHITE/MONO)
<br />THERMOPLASTIC,TRAFFIC STRIPE, WHITE,SOLI0,6'
<br />THERMOPLASTIC, TRAFFIC STRIPE,WHITE,SOLID, 12'
<br />THERMOPLASTIC, TRAFFIC STRIPE, W HITE,SOLID,24'
<br />THERMOPLASTIC,TRAFFIC STRIPE,WHITE,SKIP,B' (6'-1
<br />\
<br />ƒ
<br />\
<br />1285-7
<br />%
<br />_
<br />\
<br />,-,c,
<br />k
<br />§
<br />,
<br />1663-74-15 1
<br />)
<br />\
<br />k
<br />/
<br />)
<br />)
<br />\
<br />`
<br />w
<br />!
<br />)
<br />15
<br />
|