My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/04/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
03/04/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:47:20 PM
Creation date
3/23/2016 8:45:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/04/2014
Meeting Body
Board of County Commissioners
Book and Page
221
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VA.tif
SmeadsoftID
13691
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />PUBLIC WORKS DEPARTMENT <br />STORMWATER DIVISION <br />1801 27th STREET <br />VERO BEACH, FLORIDA 32960 <br />Phone: (772) 226-1562 <br />CONSENT <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />FROM: W. Keith McCully, P.E., Stormwater Engineer it/0 <br />SUBJECT: CLOSE-OUT AND FINAL PAYMENT OF WORK ORDER NO. PCM -2 <br />FOR SEDIMENT REMOVAL AT PC MAIN SCREENING FACILITY <br />DATE: February 11, 2014 <br />DESCRIPTION AND CONDITIONS <br />The purpose of this Agenda Item is to request the County Commission approve final <br />payment including release of retainage, for Work Order No. PCM -2 with EMC Divers, <br />Inc. The Work Order was for sediment removal from the PC Main Screening Facility's <br />sediment traps. The dredging company was unable to completely clean one of the <br />sediment traps and final payment is prorated based on the material actually removed. <br />The final prorated payment due EMC Divers is $6,780.02 (representing removal of <br />approximately 95.5 percent of the trapped sediment). The contractor incorporated <br />inefficient dredging methods that resulted in loss of storage capacity in PC Main's <br />dredged material dewatering system, causing the County to terminate the Work prior to <br />final completion. The total amount of the original Work Order was $7,200. Payment of <br />the $6,780.02 will terminate Work Order No. PCM -2. <br />ANALYSIS <br />Alternative No. 1 — Approve the final (prorated) payment of Work Order No. PCM -2 for <br />$6,780.02 <br />Alternative No. 2 — Reject the final (prorated) payment of Work Order No. PCM -2. <br />F:\Public Works\KeithM\Stormwater Projects\Main Relief Canal Operation\Dredging Sedimentation Basins\Agenda Items\Agenda - <br />Consent - Final Payment for Work Order #PCM-2.doc <br />S7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.