Laserfiche WebLink
11. Field observe and record vertical ground elevations, cross sections and all specific points <br />and changes in contour within the right of way corridor and 20 feet outside of right of way. <br />Field observe and record existing above ground man-made and natural features within right <br />of way corridor and 20 feet outside of right-of-way. <br />Surveyor I <br />2 hours @ $140.00/hr $ 280.00 <br />Surveyor II <br />12 hours @ $125.00/hr .. $ 1,500.00 <br />Survey Crew (3 men) <br />80 hours @ $120.00/hr $ 9,600.00 <br />Total II $ 11, 380.00 <br />III. Data reduction/drafting of topographic route right of way survey maps in AutoCAD format <br />Surveyor I <br />2 hours @ $140.00/hr $ 280.00 <br />Surveyor II <br />16 hours @ $125.00/hr $ 2,000.00 <br />CAD Technician I <br />96 hours @ $80.00/hr ...$ 7,680.00 <br />Secretary/Word Processor <br />3 hours @ $40.00/hr $ 120.00 <br />Total III $ 10, 080.00 <br />TOTAL I — II $ 24,160.00 Lump Sum Fee <br />r LliS. zo <br />J:\SURVEY WORK AUTHORIZATIONS\IRC Survey 2013-2014\14-272S_IRC_WO_41street-Topo-ROW(US1 west 1100feet).doc <br />4 OF 6 <br />86 <br />