My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/15/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/15/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:46:11 PM
Creation date
3/23/2016 8:46:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/15/2014
Meeting Body
Board of County Commissioners
Book and Page
317
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VK.tif
SmeadsoftID
13701
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Bridge Design Associates, Inc.) $0.00 $207,222.00 <br />Landscape & Irrigation $0.00 $77,160.00 <br />(Thomas Lucido & Associates) (Lump Sum) <br />Pond Surveys $0.00 $25,790.00 <br />Water Main Plans (ARCADIS) $0.00 $86,145.00 <br />(Lump Sum) <br />Corridor Study (ARCADIS) $0.00 <br />Cultural Resource Assessment $0.00 <br />TOTAL PROFESSIONAL SERVICES $2,715.00 <br />HOURLY RATE ALLOWANCES <br />Allowance for Sketch and Legal <br />Descriptions and staking of parcels (375.00/each) NTE $0.00 $51,000.00 <br />Allowance for miscellaneous roadway design <br />changes due to right of way negotiations NTE $0.00 $20,000.00 <br />$15,581.00 <br />$8,925.93 <br />$2,029,110.09 <br />Allowance for Survey Crew and Soft Dig <br />Machine for Horizontal and Vertical <br />Utility Locations at Potential Conflicts <br />(Survey $I12/Hr) NTE $0.00 $20,000.00 <br />Allowance for Survey and Design <br />Of a transition to match the existing pavement <br />At the north end of the project NTE $0.00 <br />Construction Engineering Services - Public Works .... NTE $15,000.00 <br />Construction Engineering Services -Utility Dept NTE $0.00 <br />TOTAL HOURLY RATE ALLOWANCES NTE $15,000.00 <br />$27,000.00 <br />$92,877.12 <br />$10,446.24 <br />$221,323.36 <br />Compensation for the hourly rate allowances will be made on an hourly basis at the <br />hourly rates listed below: <br />Project Engineer Manager $14664 <br />Project Engineer $109.70 <br />Senior CADD Operator $85.84 <br />Cadd Draftsman. $56 89 <br />Page 3 of 5 <br />G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2014\66 th Ave Amendment No 15 4-4-14 .doc <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.