My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/15/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/15/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:46:11 PM
Creation date
3/23/2016 8:46:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/15/2014
Meeting Body
Board of County Commissioners
Book and Page
317
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VK.tif
SmeadsoftID
13701
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />CONSENT <br />TO: Joseph A. Baird <br />County Administrator <br />DEPARTMENT HEAD CONCURRENCE: <br />Stan Boling, AIC <br />Community Develo:ment Director <br />FROM: John W. McCoy, AIC\1\\A <br />Chief, Current Development <br />DATE: April 7, 2014 <br />SUBJECT: Windsor Properties, Inc.'s Request for Final Plat Approval for a Replat of <br />One Lot and a Tract to be known as Windsor Plat 28 (PD -14-04-03 / <br />2002100039-72033) <br />It is requested that the data herein presented be given formal consideration by the Board of <br />County Commissioners at its regular meeting of April 15, 2014. <br />DESCRIPTION AND CONDITIONS: <br />On February 13, 2014, the Planning and Zoning Commission approved a preliminary PD <br />plan/plat application to replat one lot and one tract within the Windsor development. The subject <br />site is located within Windsor along the west perimeter. Through the proposed replat, the <br />locations of an existing lot and tract will be flipped. The submitted final plat is consistent with <br />the approved overall conceptual PD plan for the Windsor project and the approved preliminary <br />plat for the re -plat. Now, the applicant has submitted for final plat approval for Windsor Plat 28. <br />ANALYSIS: <br />In this instance, the required improvements are minimal, consisting of some utility services <br />relocations. All subdivision improvements required to serve the lot and tract have been <br />constructed, inspected, and approved by the county. With the exception of certain utilities <br />facilities dedicated to the county, all required improvements are dedicated privately to the <br />Windsor Property Owners Association. Publicly dedicated utility improvements will be <br />guaranteed and warranted by a Bill of Sale which will be handled separately by Utilities <br />Services. Since all other improvements are dedicated privately, no warranty and maintenance <br />agreements are required. Therefore, all requirements for final plat approval have been satisfied. <br />F:\Community Development\CurDev\Final Plats\BCC staff reports \20I4\WindsorPlat28.doc <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.