My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/15/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/15/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:46:11 PM
Creation date
3/23/2016 8:46:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/15/2014
Meeting Body
Board of County Commissioners
Book and Page
317
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VK.tif
SmeadsoftID
13701
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />CONSENT <br />AGENDA <br />8H <br />TO: <br />FROM: <br />DATE: <br />Joseph A Baird; County Administrator <br />DEPARTMENT HEAD CONCURRENCE: <br />Stan Boling, AICP; <br />munity DevelopmentopenDirector <br />John W. McCoy, AI Chief, Current Development <br />March 31, 2014 <br />SUBJECT: DiVosta Homes, LP's Request for Final Plat Approval for a Subdivision to be known as <br />The Cove at Waterway Village [2004010124-71872/PD-13-08-02] <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of April 15, 2014. <br />DESCRIPTION & CONDITIONS: <br />The Cove at Waterway Village PD is a planned development project consisting of 80 lots on 29.83 <br />acres and is located at the northeast corner of 58th Avenue and 53`d Street. The property is zoned PD <br />(Planned Development), and has an L-2 (Low Density 2 up to 6 units per acre) land use designation. <br />The density for The Cove at Waterway Village is 2.68 units per acre. <br />On July 11, 2013, the county granted preliminary PD plan/plat approval for The Cove at Waterway <br />Village PD project. The applicant subsequently obtained a land development permit and commenced <br />construction of the entire project. As of this time, the applicant has built 75.23% of the required <br />improvements, is proposing to "bond -out" for the remaining 24.77% of the required improvements, <br />and has submitted the following: <br />1. A final plat in conformance with the approved preliminary plat; <br />2. An Engineer's Certified Cost Estimate for the remaining required improvements; <br />3. A Contract for Construction of remaining required improvements; and <br />The Board is now to consider granting final plat approval for The Cove at Waterway Village PD. <br />ANALYSIS: <br />Some, but not all, of the required The Cove at Waterway Village PD improvements have been <br />completed. As provided for under the LDRs applicable to this final plat application, the applicant is <br />proposing to "bond -out" for the remaining 24.77% of required improvements (utilities, roadways, <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.