Laserfiche WebLink
SUBDIVISION BONDING ESTIMATE FOR THE COVE AT WATERWAY VILLAGE <br />ATTACHMEHT 4 <br />69 <br />EARTHWORK <br />DESCRIPTION <br />DESCRIPTION <br />QUANTITY <br />... <br />QUANTITY <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />��- <br />TOTAL <br />COMPLETE <br />COMPLETE <br />MOBR17ATION <br />INCOMPLETE <br />MOBILIZATION <br />],^ <br />1 <br />LS <br />10,050.00 <br />5 <br />$ <br />10,050.00 <br />$ <br />10,050.00 <br />- <br />NPDES <br />33 00 <br />1 <br />LS <br />13365.00 <br />13,365.00 <br />$ <br />13,365.00 <br />$ <br />- <br />DEMOLITION <br />18" RCP <br />1 <br />LS <br />7,400.00 <br />- <br />7,400.00 <br />$ <br />7,400.00 <br />27,893.25 <br />85,580.00 <br />CLEARING <br />37,224.30 <br />24 <br />AC <br />415.00 <br />8" PVC SANITARY 12.14' CUT <br />9,960.00 <br />$ <br />9,960.00 <br />53.05 <br />- <br />LAKE EXCAVATION & SITE FILL. <br />"464 <br />18,300 <br />CY <br />3.32 <br />2'1,042.40 <br />60,756.00 <br />$ <br />60,756.00 <br />18" CAP <br />- <br />PAD FILL & GRADING <br />LF <br />92,900 <br />SY <br />0.42 <br />5 <br />39,018.00 <br />$ <br />39,018.00 <br />2,565.00 <br />- <br />PAD STABILIZATION (SEED) <br />46.45 <br />19 <br />AC <br />1,805.00 <br />1,858.00 <br />34,295.00 <br />$ <br />34,295.00 <br />20 <br />- <br />LAKE BANK STABILIZATION (SOD) <br />4' DIA. MANHOLE 10-12' DEEP <br />3,000 <br />SY <br />1.70 <br />. <br />5,100.00 <br />5 <br />5,100.00 <br />EA <br />- <br />SURVEY <br />840.00 <br />1 <br />1.5 <br />38,500.00 <br />30" RCP/CAP ADAPTOR <br />38,500.00 <br />$ <br />38,500.00 <br />495.00 <br />1,400.00 <br />SIGNAGE <br />TOTAL <br />$ <br />218,444.00 <br />5 <br />218,444.00 <br />$ <br />- <br />ATTACHMEHT 4 <br />69 <br />PAVING <br />DESCRIPTION <br />DESCRIPTION <br />QUANTITY <br />... <br />QUANTITY <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />��- <br />TOTAL <br />COMPLETE <br />COMPLETE <br />MOBR17ATION <br />INCOMPLETE <br />1" SP 9.5 ASPHALT (FIRST LIFT) <br />],^ <br />9,200 <br />SY <br />7.50 <br />5 <br />$ <br />69,000.00 <br />- <br />SURVEY <br />69,000.00 <br />3/4' SP 9.5 ASPHALT (FINAL LIFT) <br />33 00 <br />9,200 <br />SY <br />5.50 <br />50,600.00 <br />8"PVC SANITARY 8-10' CUT <br />X1629.85 <br />$ <br />50,600.00 <br />8" LBR 100 BASE <br />18" RCP <br />9,725 <br />SY <br />11.00 <br />- <br />106,975.00 <br />5 <br />21,395.00 <br />27,893.25 <br />85,580.00 <br />10 1/2" LBR 100 BASE ( PAVER AREA) <br />37,224.30 <br />245 <br />SY <br />14.00 <br />8" PVC SANITARY 12.14' CUT <br />3,430.00 <br />$ <br />3,430.00 <br />53.05 <br />- <br />12" STABILIZED SUBGRADE <br />"464 <br />10,900 <br />SY <br />4.25 <br />2'1,042.40 <br />46,325.00 <br />5 <br />46,325.00 <br />18" CAP <br />- <br />5' SIDEWALK ( COMMON AREAS) <br />LF <br />8,720 <br />SF <br />3.15 <br />5 <br />27,468.00 <br />- <br />24" CAP <br />2,565.00 <br />27,46800 <br />TYPED" CURB <br />46.45 <br />700 <br />LF <br />11.55 <br />1,858.00 <br />8,085.00 <br />30" CAP <br />14,875.00 <br />20 <br />8,085.00 <br />TYPE "F" CURB <br />4' DIA. MANHOLE 10-12' DEEP <br />300 <br />LF <br />16.25 <br />. <br />4,875.00 <br />$ <br />2,112.50 <br />EA <br />2,762.50 <br />2' VALLEY GUTTER <br />840.00 <br />6,000 <br />LF <br />11.90 <br />30" RCP/CAP ADAPTOR <br />71,400.00 <br />S <br />70,000.00 <br />495.00 <br />1,400.00 <br />SIGNAGE <br />5 <br />1 <br />LS <br />7,250.00 <br />4,995.00 <br />7,250.00 <br />EA <br />2,025.00 <br />DOUBLE SERVICE W/ CLEANOUT <br />7,250.00 <br />STRIPING <br />8,100.00 <br />1 <br />LS <br />2300.00 <br />15 <br />2,700.00 <br />2,480.00 <br />DEMOLITION/REMOVAL OF 8" SANITARY <br />37,200.00 <br />2,700.00 <br />37,200.00 <br />TOTAL <br />$ <br />398,108.00 <br />$ <br />143,26250 <br />$ <br />254,845.50 <br />ATTACHMEHT 4 <br />69 <br />STORM DRAINAGE <br />DESCRIPTION <br />QUANTITY <br />... <br />UNIT <br />. <br />UNIT <br />-._. COST;.. ,....... <br />TOTAL <br />��- <br />COMPLETE <br />COMPLETE <br />INCOMPLETE <br />MOBR17ATION <br />104 <br />],^ <br />12 Oil <br />\, <br />12,500:00 <br />3 1)000 <br />5 <br />$ <br />12,500.00 <br />33,500.00 <br />- <br />SURVEY <br />1 <br />] <br />33 00 <br />15" HDPE <br />10,660.65 <br />2,619, <br />- <br />8"PVC SANITARY 8-10' CUT <br />X1629.85 <br />$ <br />60,629.85 <br />28.15 <br />18" RCP <br />32,006.55 <br />1,035.95 <br />- <br />8"PVC SANITARY 10-12' CUT <br />,89325 <br />$ <br />27,893.25 <br />37.15 <br />24" RCP <br />37,224.30 <br />1,Q74' <br />1.±,.25 <br />- <br />8" PVC SANITARY 12.14' CUT <br />7,85850 <br />5 <br />37,858.50 <br />53.05 <br />30" RCP <br />13,421.65 <br />"464 <br />LFA <br />x46.35 <br />4' DIA. MANHOLE 0-6' DEEP <br />2'1,042.40 <br />5 <br />21,042.40 <br />- <br />18" CAP <br />2,165.00 <br />75 <br />LF <br />38.80 <br />4' DIA. MANHOLE 6-8' DEEP <br />2,910.00 <br />5 <br />2,910.00 <br />- <br />24" CAP <br />2,565.00 <br />40 <br />LF <br />46.45 <br />4' D1A. MANHOLE 8-10 DEEP <br />1,858.00 <br />5 <br />1,858.00 <br />2,975.00 <br />30" CAP <br />14,875.00 <br />20 <br />LF <br />63.90 <br />4' DIA. MANHOLE 10-12' DEEP <br />1,278.00 <br />5 <br />1,278.00 <br />. <br />24" RCP/CAP ADAPTOR <br />18,350.00 <br />2 <br />EA <br />420.00 <br />4' DIA. MANHOLE 12-14' DEEP <br />840.00 <br />5 <br />840.00 <br />- <br />30" RCP/CAP ADAPTOR <br />4,515.00 <br />1 <br />EA <br />495.00 <br />SINGLE SERVICE W/ CLEANOUT <br />495.00 <br />5 <br />495.00 <br />. <br />TYPE "C" INLET <br />4,995.00 <br />4 <br />EA <br />2,025.00 <br />DOUBLE SERVICE W/ CLEANOUT <br />8,100.00 <br />$ <br />8,100.00 <br />- <br />VALLEY GUTTER INLET <br />21,240.00 <br />15 <br />EA <br />2,480.00 <br />DEMOLITION/REMOVAL OF 8" SANITARY <br />37,200.00 <br />$ <br />37,200.00 <br />- <br />MANHOLE <br />1,491.00 <br />5 <br />EA <br />2445.00 <br />DEMOLITION/REMOVAL OF MANHOLE <br />12,225.00 <br />$ <br />12,225.00 <br />- <br />YARD DRAIN <br />1,300.00 <br />14 <br />EA <br />955.00 <br />LINE INSPECTION <br />13,370.00 <br />$ <br />13,370.00 <br />- <br />NPDESINLET PROTECTION <br />5,118.75 <br />1 <br />LS <br />2,100.00 <br />2,100.00 <br />5 <br />2,100.00 <br />167,149.15 <br />DEMOLITION/REMOVAL OF 48" RCP <br />5,118.75 <br />65 <br />LF <br />35.00 <br />2,275.00 <br />5 <br />2,275.00 <br />- <br />TOTAL <br />5 <br />276,075.00 <br />$ <br />276,075.00 <br />• <br />ATTACHMEHT 4 <br />69 <br />SANITARY SEWER <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />COMPLETE <br />INCOMPLETE <br />8" PVC SANITARY 0-6 CUT <br />104 <br />LF <br />22.50 <br />2,340.00 <br />2,340.00 <br />- <br />8" PVC SANITARY 6-8' CUT <br />429 <br />LF <br />24.85 <br />10,660.65 <br />10,660.65 <br />- <br />8"PVC SANITARY 8-10' CUT <br />1,137 <br />LF <br />28.15 <br />32,006.55 <br />32,006.55 <br />- <br />8"PVC SANITARY 10-12' CUT <br />1,002 <br />LF <br />37.15 <br />37,224.30 <br />37,22430 <br />- <br />8" PVC SANITARY 12.14' CUT <br />253 <br />LF <br />53.05 <br />13,421.65 <br />13,421.65 <br />- <br />4' DIA. MANHOLE 0-6' DEEP <br />1 <br />EA <br />2,165.00 <br />2,165.00 <br />2,165.00 <br />- <br />4' DIA. MANHOLE 6-8' DEEP <br />1 <br />EA <br />2,565.00 <br />2,565.00 <br />2,565.00 <br />- <br />4' D1A. MANHOLE 8-10 DEEP <br />5 <br />EA <br />2,975.00 <br />14,875.00 <br />14,875.00 <br />- <br />4' DIA. MANHOLE 10-12' DEEP <br />5 <br />EA <br />3,670.00 <br />18,350.00 <br />18,350.00 <br />- <br />4' DIA. MANHOLE 12-14' DEEP <br />3 <br />EA <br />4,515.00 <br />4,515.00 <br />4,515.00 <br />- <br />SINGLE SERVICE W/ CLEANOUT <br />9 <br />EA <br />555.00 <br />4,995.00 <br />4,995.00 <br />- <br />DOUBLE SERVICE W/ CLEANOUT <br />36 <br />EA <br />590.00 <br />21,240.00 <br />21,240.00 <br />- <br />DEMOLITION/REMOVAL OF 8" SANITARY <br />70 <br />LF <br />21.30 <br />1,491.00 <br />1,491.00 <br />- <br />DEMOLITION/REMOVAL OF MANHOLE <br />1 <br />EA <br />1,300.00 <br />1,300.00 <br />1,300.00 <br />- <br />LINE INSPECTION <br />2,925 <br />LF <br />1.75 <br />5,118.75 <br />- <br />5,118.75 <br />TOTAL <br />$ <br />172,267.90 <br />167,149.15 <br />5 <br />5,118.75 <br />ATTACHMEHT 4 <br />69 <br />