Laserfiche WebLink
Regular Agenda Item <br />INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: April 10, 2014 <br />To: Joseph A. Baird, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services 6#) <br />Prepared By: Arjuna Weragoda, P.E., Capital Projects Manager AW <br />Subject: Alternative Water Supply Evaluation — Work Order No. 11 with CDM Smith Inc. <br />DESCRIPTIONS AND CONDITIONS: <br />On February 4th, 2014 under Commissioner Bob Solari's matters, the Indian River County Board of <br />County Commissioners (BCC) directed staff to do the following: <br />• Review the conclusions of the 2007 Alternate Water Supply Study which suggests having a <br />surface water supply for the future; <br />• Enter into dialogue with the St. John's River Water Management District to obtain the <br />expertise that they can offer; <br />• Design a long term system; <br />• Analyze the usage of water in the County; <br />• Bring the Board a proposal for a feasibility study to develop a fresh surface water system <br />complete with necessary reservoir system; and <br />• Include in the proposal a request for funding from the St. John's River Water Management <br />District. <br />Concurrently staff has met with St. Johns River Water Management District staff and attended their <br />presentations on the Draft District Water Plan. <br />ANALYSIS: <br />Staff requested that CDM Smith, Inc (CDM) prepare a proposal to embark on a study for an <br />alternative water supply. The proposal for an alternative water supply evaluation will be conducted <br />in a phased approach. <br />Phase I- Preliminary Evaluation <br />Phase II — Modeling and Land Acquisition <br />Phase III — Final design, permitting and construction <br />The subject authorization from BCC is only for the Phase I portion of the evaluation. Phase I of the <br />evaluation will address all the bulleted items requested by BCC except designing a long term system. <br />f:\Utilities\UTILITY - Engineering\WATER\Alternative Water Supply\2014 Alternative Water Supply\Agenda - Alternative Water Supply Evaluation -4- <br />14-14.docx Page 1 of 2 <br />98 <br />