Laserfiche WebLink
Smith <br />2301 Maitland Center Parkway, Suite 300 <br />Maitland, Florida 32751 <br />tel: +1 407 660-2552 <br />fax: +1 407 875-1161 <br />cdmsmith.com <br />April 14, 2014 <br />Mr. Vincent Burke, P.E. <br />Director of Utility Services <br />Indian River County <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Subject: <br />Dear Mr. Burke: <br />Continuing Consulting Services <br />Work Order No. 11 <br />Alternative Water Supply Evaluation <br />Surface Water Reservoir Feasibility Analysis (Phase 1) <br />Transmitted herewith are two copies of Work Order No. 11 for professional services related to the <br />Phase 1- Feasibility Analysis to construct a future surface water storage reservoir. This <br />authorization is to provide identification of key project components and stakeholders, preliminary <br />evaluation of a specific project site, environmental due diligence evaluation for the proposed site, <br />and development of an amendment to the previously prepared Alternative Water Supply Master <br />Plan (AWSMP). <br />Due to the nature of this project, CDM Smith will rely primarily on senior technical experts to <br />perform the evaluation and review the available data. As project manager, I (Jill Grimaldi) was <br />actively involved in the development of the initial AWSMP. Now a Senior Project Manager and <br />Principal Scientist,1 will again take a lead role in developing the future demand requirements and <br />evaluating the proposed reservoir property/project. In addition, Principal Engineer Lena Rivera <br />will take the technical lead in sizing the reservoir, developing the water balance, reviewing the data <br />collected and evaluating the logistics for connecting the reservoir to the proposed water treatment <br />plant. Lee Wiseman, Associate Engineer, will oversee all facets of this project and insure that the <br />evaluation is comprehensive and that the end recommendations are viable for use in determining <br />the next steps to be taken. Eric Grotke will serve as the Officer -in -Charge of the project and serve as <br />both the client service leader and in the capacity of reviewer of all deliverables. CDM Smith will also <br />rely on junior level drafters and engineers for development of figures, maps, and data entry. <br />CDM Smith looks forward to working with the County on this project. <br />p1419REVS121.doc.docs <br />WATER + ENVIRONMENT + TRANSPORTATION + ENERGY + FACILITIES <br />4 <br />101 <br />